Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
Subcontractors inducted
-
Safe work procedures followed
-
New workers inducted
-
Site diary up to date
-
"As Constructed" information up to date
-
"Inspection and Test Plan" up to date
Amenities
-
Compound secure and safe
-
Compound & site clean and good house keeping practiced
-
Toilet clean and in good condition
-
Amenity huts and lunch room adequate for project
First Aid
-
First aid facilities in place
-
First aid officer nominated
-
Emergency numbers displayed
Personal Protection Equipment
-
Hearing protection available
-
Safety footwear being worn
-
Helmets worn
-
Safety jackets worn
-
Eye and sun protection available
Trench / Excavation
-
Ground support > 1.5m
-
Mine manager onsite
-
Workcover notified > 1.5m
-
Barricade for open trench
-
Lookout on top at all times
-
Relevant permits to work obtained
Plant and Equipment
-
Waste oil collected
-
Daily plant inspections and fault reports being carried out
-
Subcontractors plant in good condition and inspected daily
-
All operators competency tested
-
Vehicles parked to reduce impact on road users and pedestrians
-
Electric leads and tools in good condition and tagged
Site Safety
-
Warning signs, traffic and public in place as per road sign code
-
Toolbox meeting held. Records kept on site
-
Inspect for dangerous goods
-
Applicable MSDS onsite
-
Work practices inspected for potential hazards with workers
-
Warning signs stacked and clean
-
Existing services located
-
Appropriate lighting for night work
-
Inspect for other hazards
Environmental
-
Erosion control arranged
-
Sedimentation control arranged
Sign Off
-
General comments:
-
Defect/Suggestion report form and copy of report given to safety coordinator: Yes/No............
-
Signed (Inspection officer)
-
MFJ Constructions (Vic.) Pty. Ltd. Issue 4, 1 April 2007. MFJ-Form 03-01