Title Page
-
Pm Order No.
-
EC Tag
-
56C Cable Replacement
-
New Business / WRO (PG&E estimate included with Crew instructions)
-
Location
-
Conducted on
-
Prepared by
Jobsite Details
-
1.) USA Required?
-
USA notes:
-
USA photo
-
2.) Traffic Control Required?
-
Traffic Control notes:
-
Traffic Control photo
-
3.) No Parks Required?
-
No Parks notes:
-
No Parks photo
-
4.) Crane Required?
-
Yes, crane required (brief description):
-
Crane notes:
-
Crane Photo:
-
5.) PSC Required?
-
PSC notes:
-
PSC photo
-
6.) AT&T / Comcast Required?
-
AT&T / Comcast notes:
-
Communication photo
-
7.) Civil Support Required?
-
Civil notes:
-
Civil photos
-
8.) Tree Trimming needed?
-
Tree Trimming notes:
-
Tree Trimming photos
Equipment/ Special Conditions
-
Notes:
Outage Setups
-
Each project will require different types of outage information. Below you will choose between PG&E's "Application for Work" types:
-
Notification / Other Required?
-
Notification/Other details (Address / meter #)
-
Non Test Required?
-
Non-Test details
-
Transformer Only Required?
-
TX details
-
End of Line Required (EOL)?
-
EOL details
-
EOL Limit 1
-
Clearance Required?
-
Clearance details
-
Clearance Limit 1
-
Clearance Limit 1 Notes
-
Clearance Limit 2
-
Clearance Limit 2 Notes
-
Clearance Limit 3
-
Clearance Limit 3 Notes
-
Clearance Limit 4
-
Clearance Limit 4 Notes
-
Clearance Limit 5
-
Clearance Limit 5 Notes
-
Clearance Limit 6
-
Clearance Limit 6 Notes
-
Is phasing required?
-
Location
-
Is rotation required?
-
Location
Existing Field Conditons
-
Existing G.O. 95/128 infractions must be identified on pre-field check by GF. Infractions will either need to be repaired by foreman onsite during construction of EC/ER tag created to be repaired at later date by other. If EC/ER tags are identified, provide pictures of each item for submittal process
-
Are all work locations clear of existing infractions?
-
Infraction 1
-
Infraction Detail
-
Infraction 2
-
Infraction Detail
-
Infraction 3
-
Infraction Detail
-
Infraction 4
-
Infraction Detail
-
Infraction 5
-
Infraction Detail
-
Infraction 6
-
Infraction Detail
Additional photos
-
Additional photos and jobsite information
-
Add media
-
Notes: