Information

  • Audit Title

  • Job Description

  • Location
  • Conducted on

  • Prepared by

  • Service Provider

  • Contractor(s)

  • Work Group (name of crew leader & members)

  • Auditor(s)

  • Additional Representative(s)

1. Environmental Assessment and Planning

  • Does the JSA identify environmental risks

  • Does the JSA identify controls to mitigate the identifed environmental risks

  • Have the appropriate controls been put in place on site?

  • Are the potential environmental risks and issues understood by the Site Supervisor or Manager

  • Are staff aware of how to report an environmental incident/near miss?

  • Can evidence of soil assessment documentation be produced (I.e. Primary Site Investigation, Risk Assesment, Soil Risk Assessment)

  • Is noisy plant and machinery switched off when not in use?

  • Has due care and attention been given to excavations beneath the drip lines of any trees?

  • Are the drip lines of any trees on site free of large/heavy equipment?

  • Are dust generating activities (i.e. concrete cutting), being managed correctly i.e. water hoses attached to cutting equipment?

2. Environmental Management

  • Is waste stored suitably (has climatic conditions been consdered, is it stored on a ground sheets and also covered, are silt traps in use)?

  • Are erosion and/or sediment control structures in place and stable?

  • Are erosion and/or sediment control structures located between source (i.e. spoil) and receptor (i.e. drain)?

  • Is the waste area well maintained and tidy?

When working near waterways and flood plains is sufficient mitigaton in place to avoid environmental harm (i.e. bank erosion, silty run off)?

  • Are soils excavated in a way that will allow it to be replaced in the order of excavation to avoid the possibility of soil inversion?

  • Has any trench water encountered on site been managed appropriatley in accordance with State Environment Policy and best prctice guidance?

3. Spoil Management

  • If handling contaminated soils, do the vehicles being used have the required EPA certificates/licences?

  • Do site staff have access to the relevant Service Provider waste management procedures?

4. Hazardous Material Management

  • Are all fuels and/or chemicals properly marked?

  • Are all fuels and/or chemicals stored in containers that are in good condition (i.e. no leaks present) as per MNG-CG-0016?

  • Are SDS available for the chemicals stored on site?

  • Are spill kits available, and if required, in use correctly?

  • Is large mobile plant in good condition? (I.e. no sign of leaking and well maintained)?

  • Is any siphon water encountered being captured by a suitable vehicle?

  • Following transportation, is siphon water disposed of correctly?

  • Have nature strips been returned to a suitable condition (seeded correctly, grass reinstated if available?)

  • Has all stockpiled material been removed from previous construction areas?

  • Have all footpaths and roads been cleaned?

  • Comments and weather condistions

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.