Title Page

  • Conducted on

  • Prepared by

  • Shift

Feeder Daily Cleans

  • Blow out all waste and debris from feeder section.

  • Clean and lubricate all shafts using LPS 1 or equivalent

  • Check all moving rollers and lubricate if needed.

  • Check all LEF wheels and report any defects or damage

Slotting Unit Daily Cleans.

  • Clean and lubricate all shafts with LPS 1 or equivalent

  • Check overall knife condition, Male and Female, report any issues for next PM

  • Visual check of waste build up underneath the waste belt and plan into next PM session when required.

Die - Cut Section Daily Cleans

  • Blow down all shafts and lubricate with LPS 1 or equivalent

  • Check condition of anvil covers and report any defects. Plan to rotate or skim if required.

Folder/Gluer Daily Cleans

  • Remove all dried glue from the gluing heads.

  • Clean and lubricate all the inlet and outlet shafts with LPS 1 or equivalent

  • Are folding rail tracks clean and free from waste and debris.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.