Information

  • Report number / Job Number

  • Site:

  • Audit must have site details

  • Tempeture
  • What are weather conditions like

  • Client:

  • What type of structure is being audited

  • New or existing building

  • Conducted on

  • Prepared by

  • Location
  • Other Personnel onsite

Access to System

  • How Is Access Gained To Systems

  • Name access

    Data Plate
  • How many

  • Is data plate legible?

  • Is all required information on the plate?

  • Date of last inspection

  • Installation date of system

  • Installed by

  • Manufactured by

  • Persons per system

  • System load rating

  • System ID number

  • Were any new data plates installed

  • Photos

  • Fixed Ladders
  • How many?

  • Vertical or pitched

  • Manufacture of ladder

  • Is the ladder secured appropriately?

  • Ladder must be removed or tagged out of service

  • Can ladder be accessed safely using correct PPE

  • Are all fixings in place as per Manufacturers installation instructions

  • Is there any visible damage to the ladder?

  • Is there a fall arrest line on the ladder?

  • If fall arrest line present include in static line section of this report

  • Does the line have a shock absorber?

  • If shock absorber present record details in associated equipment register

  • Is the line installed in a compliant manner?

  • Is there a cage on the ladder?

  • If no lifeline or cage is present would one be recommended?

  • Is there any other issues affecting the safe operation of the ladder?

  • Ladder Brackets
  • How many?

  • Photos

  • Is the bracket installed as per the manufactures specifications?

  • Have any modifications been made to the bracket or parent structure?

  • What brand of bracket is installed

  • With the appropriate ladder can the bracket be used to access the required area safely?

  • Walkways
  • Do they comply to AS1657:2018?

  • What type

  • What brand in known

  • Platforms present

  • Are platforms installed correctly

  • Is current layout safe to use

  • What is required to platform / walkway to make compliant

  • Are there handrails on-site
  • Do they comply to AS1657:2018?

  • What are they fixed to

  • What brand in known

  • Is current layout safe to use

  • What is required to make compliant

  • Lanyards / Strops
  • How many?

  • Photo

  • Has the lanyard/wire rope been damaged or modified in any way?

  • Is there any deterioration in the anchorage/parent structure?

  • Is the line the appropriate length for the designated task?

  • Fixed Anchor Points
  • Are all anchors individually tagged?

  • Photos of anchor tags

  • Is a ID plate used at access point to identity anchors.

  • Abseil (15kN+)

  • Are these anchors present onsite?

  • How many

  • Types of anchor present

  • Is anchor a minimum 200mm from any edge

  • Fall Arrest (15kN+)

  • Are these anchors present onsite?

  • How many

  • Types of anchor present

  • Is anchor a minimum 200mm from any edge

  • What are the anchors fixed to?

  • Please advise

  • If the anchor is fixed to concrete or bricks all anchors must be pull tested to 7.5Kn for 2 Minutes. If Tri Plate, please note if each fixing was tested. Tri plate anchors can be direct pulled as per single eyelet.

  • What Adhesive was used to install anchors / rods

  • Was reinforcing steel hit why drilling into concrete

  • Was a new hole drilled to avoid steel?

  • Was a testing device used?

  • If a testing device was used please provide make model and serial number

  • Photo of testing device

  • Any signs of deterioration in the anchor or parent structure?

  • Any corrosion or rust present in anchor or parent structure?

  • Is the anchor damaged or deformed from usage or loading?

  • Has the anchor or parent structure been modified in any way?

  • Is there any other factors that would prevent the anchor holding its intended load when required?

  • Static Lines
  • How many

  • Types of lines present

  • Brand

  • What are the lines fixed to?

  • Is anchor a minimum 200mm from any edge

  • If the line is fixed to concrete or bricks all anchors must be pull tested to 7.5Kn for 2 Minuets

  • Was a testing device used?

  • If a testing device was used please provide make model and serial number

  • Is the line tensioned appropriately?

  • Are all bolts, rivets, screws and fastenings secure?

  • Any corrosion or rust present in system or parent structure?

  • Any corrosion or rust present in travel/attachment device?

  • Is there any brittleness or fraying in the steel cable?

  • Does the travel device operate smoothly along the entire system?

  • Does the system have a shock absorbing device?

  • Has the shock absorber been deployed or damaged in any way?

  • Does the line have a working tension indicator?

  • Are all joints and swages secure?

  • Photo of swage

  • Is there any visible cuts or dents in the system?

  • Is there any other visible damages or modifications that may cause the system to fail?

  • Load rating per system

  • Load rating per span

  • Fixed (RopeAccess) Rail Systems?
  • How many

  • Load rating per system

  • Load rating per span

  • Types of rails present

  • Brand of rail

  • What are the rails fixed to?

  • Is anchor a minimum 200mm from any edge

  • If the rail is fixed to concrete or bricks all anchors must be pull tested to 7.5Kn for 2 Minuets

  • Was a testing device used?

  • If a testing device was used please provide make model and serial number

  • Are all bolts, rivets, screws and fastenings secure?

  • Are all joints under the maximum allowable distance of 4mm

  • Is the rail mounted as per the manufactures specifications?

  • Are any bolts or connectors missing?

  • Any corrosion or rust present in system or parent structure?

  • Is the rail free from any contaminants?

  • Is the rail free from dents, cracks, splitting and other damages?

  • Any corrosion or deterioration present in travel/attachment device?

  • Does the shuttle/travel device operate smoothly along the entire system?

  • Is there any other visible damages or modifications that may cause the system to fail?

  • Other Structures for Anchoring (Davits)
  • Are these present onsite.

  • What materials are they made from.

  • Photos

  • Is the structure a permanent support of the building?

  • Can it be accessed with ease?

  • Is the structure free from dirt, grease, insects and other contaminants?

  • Does the structure have any sharp edges or burrs?

  • Will the structure hold a minimium 15+kN load?

  • Is anchor a minimum 200mm from any edge if mounted to concrete

  • What is the maximium WLL

  • Could slings or other rigging slip off?

Final Appraisal

  • What is the result of the inspection?

  • If anything besides safe for use was selected please give details

  • Items to be addressed

  • Photos

  • Will a return visit be required? If yes provide details

  • Additional notes from technician

By Submitting this audit, the Technician has confirmed the site / systems are safe and comply to all relevent stardards uneless stated in above report.

  • I Agree

Extra details regarding this project

  • Please add any extra detail you have regarding the project and systems being inspected.

  • Is your housekeeping up todate on this project. All rubished removed leftover materials stacked neatly?

The Auditor needs to demonstrate they are complying with their obligations as an employee, what specific remedial action they propose for this site, and if any overall modifications are required to their Health and Safety Plan / safety procedures / supervision. Prompt corrective action is required to eliminate any agreed deficiencies, and areas of any disagreement need to be further explored in writing. All “failed responses” need to be addressed / Reported to Client and resolved. If you have any concerns regarding this audit, please contact your supervisor to help resolve your concerns.

  • Do you agree?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.