Title Page

  • Project Name & No:

  • Inspection No:

  • Principle Contractor:

  • Inspection Date:

  • Inspected By:

  • Site Address:

  • Project Team Distribution:

Summary

  • Comments:

Site Safety Questions:

Site Set Up / Welfare & Security

  • Are the PC site security, welfare & office arrangements sufficient for the project & are they maintained regularly?

  • Have MLG displayed the statutory notices regarding polices, procedures & insurances?

  • Is there suitable safe access & egress, including lighting & power, segregation, signage & emergency arrangements?

MLG H&S Documentation

  • Are all trade & MLG personnel site inducted using the MLG induction?

  • Are RAMS in place, approved by the PC & regularly reviewed for all MLG / Trade task works? Have they been briefed & signed by all relevant operatives with evidence in place?

  • Are daily safe starts implemented & signed by relevant operatives for all MLG activities?

  • Are tool box talks carried out weekly, with briefing registers in place for all operatives?

  • Are weekly management H&S inspections carried out and filed?

  • Have MLG trades implemented monthly H&S inspection reports?

MLG Training & Competency

  • Are all CSCS cards in date & trade specific?

  • Are all site management compliant with SSSTS & SMSTS with sufficient management levels in place?

MLG Working at Height Procedures

  • Are all MLG working at height activities carried out as per company procedures? Are all operatives trained & competent?

  • Are sufficient access equipment inspection schedules in place, maintained & registered?

  • If in use, are sufficient fall arrest equipment inspections in place, maintained & registered?

  • Where needed, is there correct segregation, edge protection, signage, tool tethering & permit procedures in place?

MLG Plant & Equipment Procedures

  • Is there a PUWER, LOLER & PAT testing schedule in place, maintained & registered?

  • Is all work equipment suitable & fit for purpose for all MLG activities?

  • Are all operatives trained & competent to use plant & equipment relevant to their task works?

MLG House keeping Procedures

  • Are all MLG work areas free from generating trip hazards or obstructions within safe route? Are areas clean & Tidy?

  • Are all MLG work areas segregated sufficiently with suitable signage in place, including COSHH?

  • Are adequate procedures in place for waste segregation & removal, including COSHH related waste?

  • Are adequate COSHH storage, segregation & removal procedures in place?

  • Are suitable storage containers / racks provided by MLG or Trades?

MLG Fire Safety & Hot works Procedures

  • Are all hot works carried out in accordance with MLG procedures, including respiratory & fire PPE, site permit systems, fire hazard control (Extinguishers) & segregation?

  • Is the sufficient fire watch procedures in place with adequate levels of fire marshals?

  • Are all flammable & gas cylinders stored correctly within lockable cages complete with signage?

  • Are all combustibles materials protected with LPS1207 sheeting?

MLG Logistics & Lifting Procedures

  • Are delivery, unloading & material movement procedures sufficient for MLG work activities?

  • Are MLG lifting operations carried out in accordance with MLG procedures, including correct segregation, plant & equipment inspection, correct permits & supervision.

MLG Occupational Health

  • Are correct MLG procedures implemented for all high level noise activities?

  • Are correct MLG procedures implemented for all dust producing activities, including RPE & Dust extraction?

  • Are all manual handling activities managed correctly?

  • Are suitable control measures in place relating to HAVS exposure for all MLG activities?

PPE

  • Are all operatives / site members adhering to the MLG 5 point PPE policy?

  • Is task specific PPE implemented as & when required?

  • Is there a sufficient PPE register in place for all MLG site staff & Trades?

Accident & First Aid Procedures

  • If applicable, have all accidents, incidents & near misses been reported?

  • Are there sufficient levels of first aid equipment onsite with adequate levels of trained first aiders?

Safe Working Procedures

  • Is the correct level of MLG asbestos procedures in place, including documentation, awareness, permit & reporting procedures?

  • Are the correct permits systems implemented or adhered to by MLG for all working activites?

  • Are MLG work areas coordinated & controlled in accordance with all current site activities?

  • Are site specific rules being adhered to by all MLG operatives & staff?

Other Site Comments

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.