Title Page
-
Client:
-
Prepared by:
-
Conducted on:
Safety Program Audit
Hazard Communication (Right to Know)
-
Written Plan
-
Annual Training Documentation
-
New Employee Training Documentation
-
Training Outline
-
SDS’s Available for Employee Review
-
Chemical Inventory List
-
Secondary Container Labeling
-
Notes
AWAIR
-
Written Plan
-
Annual Training Documentation
-
New Employee Orientation Documentation
-
New Employee Orientation Outline Available
-
Safety Committee Organized and Periodic Safety Committee Meeting Held
-
Employee Request for Corrective Action Forms Available
-
Management, Supervisor & Employee Responsibilities
-
In-house Inspection Forms Available & Documented Periodically
-
Disciplinary Policy Outlined & Enforced
-
Safety Goals Set & Reviewed
-
Notes
Injury Log OSHA 300
-
Recordable Injuries Logged are Current
-
Injury Reports Available & Reviewed by Safety Committee
-
300A Log Posted (Feb. 1st – April 30th Annually)
-
Columns Totaled
-
Corrective Action Taken if Applicable
-
Notes
Lockout Tagout
-
Written Plan
-
Annual Training for Authorized Employees
-
Annual Awareness Training for Affected & Other Employees
-
Annual Program Audit Checklist
-
Equipment Specific Energy Isolation Checklists
-
Equipment Sufficient to Isolate all Operating Energy Sources
-
Authorized Employees Equipped with Their Own Lock & Tag
-
One Key per Lock
-
Equipment Sign-out Sheet (Non-mandatory)
-
Procedure for Device Removal by Supervisor or Another Authorized Employee
-
Compliance with Plan Enforced
-
Notes
PPE
-
Written Plan
-
Annual Training Documented
-
Job Hazard Analysis
-
Plan Enforced
-
Required Areas Posted
-
Employees Fit Tested
-
Supplied for Employees by Employer if Required
-
Notes
Respiratory Protection
-
Written Plan
-
Annual Training Documented
-
Medical Evaluations Documented & Updated
-
Annual Fit Testing Documented
-
Air Quality Monitoring Documented for Respirable Hazards
-
Filter Changing Frequency Documented
-
Policy for Non-mandatory Use of Respirators
-
Proper Storage
-
Notes
Blood Borne Pathogens
-
Exposure Control Plan
-
Annual Employee Awareness Training Documented
-
Annual Safety Committee/ERT Training Documented
-
Safety Committee/ERT Vaccination or Declination Forms Updated
-
Notes
Hearing Conservation
-
Written Plan
-
Annual Employee Training Documented
-
Affected Areas Posted
-
Noise Map Developed (Dosimeter Testing)
-
Variety of Hearing Protection Available for Employees
-
Proper Use Enforced
-
Annual Audiological Testing Conducted for Affected Employees
-
Notes
Confined Space Entry
-
Written Plan
-
Annual Training Documented
-
List of Authorized Employees
-
List of Permit Required Confined Spaces
-
List of Space Specific Hazards
-
Physical
-
Mechanical
-
Atmospheric
-
Safe Entry Procedures
-
Hazard Control Procedures
-
Air Monitoring Requirements
-
Oxygen
-
Flammables
-
Toxics
-
List of Confined Space Entry Equipment
-
Calibration Requirements of Air Quality Monitor
-
On-Site/Off-Site Rescue Team Acquired
-
If On-site, CPR/First Aid Certification of at least One Team Member
-
If Off-site, Documentation of Availability, Competence, & Knowledge of On-site Confined Spaces
-
Permits Retained for 3 Years
-
Confined Spaces Posted & Entry Restricted
-
Hot Work Permit Available – if Applicable
-
Responsibilities of Authorized Attendant & Entrant Defined
-
Policy for Cancellation of a Permit
-
Safe Entry Procedures into Non-permit Required Confined Spaces
-
Notes
Emergency Response/Contingency Plan
-
Written Plan
-
Emergency Response Team (ERT) Assigned Titles & Job Duties
-
Evacuation Maps Developed & Posted
-
Emergency Contact List Developed & Posted
-
Plan Sent to Appropriate Agencies (Cover Letters Available)
-
Chemical/Waste Inventory in Plan
-
Periodic ERT Trainings Held and ERT Meetings Documented & Minutes Recorded
-
Spill Kits On-site & Contents Listed in the Plan (Including an Explanation of how to use PPE)
-
ERT has Written Authority to Act
-
Incident Reports Available in Plan & Completed as Necessary
-
Notes
Fire Prevention Plan
-
Written Plan
-
List of all major fire hazards
-
Proper handling and storage procedures for hazardous materials
-
List of potential ignition sources and their control
-
List of the type of fire protection equipment necessary to control each major hazard
-
Procedures to control accumulations of flammable and combustible waste materials
-
Procedures for regular maintenance of safeguards installed on heat-producing equipment to prevent the accidental ignition of combustible materials
-
Name or job title of employees responsible for maintaining equipment to prevent or control sources of ignition or fires
-
Name or job title of employees responsible for the control of fuel source hazards
-
Notes
Emergency Action Plan
-
Written Plan
-
Procedures for reporting a fire or other emergency
-
Procedures for emergency evacuation, including type of evacuation and exit route assignments
-
Procedures to be followed by employees who remain to operate critical plant operations before they evacuate
-
Procedures to account for all employees after evacuation
-
Procedures to be followed by employees performing rescue or medical duties
-
List of every employee who may be contacted by employees in need of more information about the plan, or an explanation of their duties under the plan
-
Notes
Industrial Lift Trucks
-
Written Plan
-
Authorized Employee Training Documented
-
Classroom Training
-
Written Testing
-
Practical Driving Evaluation
-
License Available On Person
-
Per Shift Inspections Documented
-
Proper Use of Seatbelts
-
Periodic Retraining
-
Every 3 Years and After Unsafe Driving is Observed
-
Classroom Training
-
Written Testing
-
Practical Driving Evaluation
-
License Available On Person
-
Policy for Removing Forklift from Operation if Unsafe
-
ID Plates Legible
-
Recharge Stations Equipped with Appropriate PPE – if Applicable
-
Notes
Notes
-
undefined