Information
-
SimPRO No :
-
Enable Ref No :
-
Customer Address:
-
Plan Completed by :
-
Date Completed :
PLAN DETAILS
Customer / Job Details
-
Customer Name & Contact Number
-
Type of installation?
- Brownfield Connection
- Brownfield (with PALI) Connection
- Greenfield Connection
- MDU Connection
- ROW Connection
- Internals Only
- Civil Relocate
- Commercial Connection
- OTHER
H&S / SITE HAZARD INFO
-
Working at Heights Required?
-
Provide details (e.g. if EWP required etc)
-
Gas Present?
-
If Gas is present then the Plan MUST avoid the Gas Exclusion zone (refer to the Enable Standards for details)
-
Dogs on site?
-
Action Required :
-
SACM on site?
-
Provide Details / Location
-
Any other hazards on site?
-
Please provide details of other hazards
CIVIL DETAILS
-
Is CIVIL Required?
-
Road Level Category
-
FAP Sighted
-
Tube (at FAP) Sighted
-
Does the Customer have any specific local utilities?
- Irrigation System
- Local Power to Outside Lights, Automatic Gates etc
- Electronic Dog Fencing
- Robotic Lawn Mower Boundary Wire
- OTHER
-
FENCELINE Distance (Metres)
-
TRENCH (SOFT SURFACE) Distance (Metres) - Includes Hand Dig, Terra Saw etc
-
TRENCH (LANDSCAPED) Distance (Metres) - Includes Stones, bark, weedmat, plants / shrubs etc
-
SLOT CUT (ASPHALT) Distance (Metres)
-
SLOT CUT (CONCRETE) Distance (Metres)
-
TRENCH (ASPHALT) Distance (Metres)
-
TRENCH (CONCRETE) Distance (Metres)
-
Default Metres (Radial)
-
Actual Metres (FAP - ETP)
-
Reason for Variation (if Default & Planned Distance varies) :
-
Additional Notes for Civil Tech
PREMISE INSTALL DETAILS
-
Is any Premise Installation work required?
-
IMPORTANT NOTE: SACM (if present) is captured in the H&S / HAZARD INFO Section
-
Does the Customer have a Media Panel?
-
ETP to ITP / ONT Distance (Metres)
-
Distance in Ceiling (Metres)
-
Distance Under Floor (Metres)
-
Proved End to End Route is Accessible
-
Access Issue Details (if any)
-
Phone Integration / Copper Cutover Required
-
Install Type
-
Additional Notes for Install Tech
PHOTOS
-
Screen Shot of Property from Webmaps - https://www.enable.net.nz/maps
-
Photos - Outline of Works (Civil - FAP to ETP and Internals = ETP to ONT / RGW position)
SAMPLES OF COMPLETED WORK
-
Fenceline
-
Fenceline - Sign as Agree
-
Slot Cut - Asphalt / Concrete
-
Slot Cut - Sign as Agree
-
Trench
-
Trenching - Sign as Agree
SIGNED CONSENT
-
I confirm that:
- I have seen, read and understood this information and the end user terms and accept those terms; and
- If I am not the owner of the property, I have obtained the consent of the owner for the installation works; and
- I understand that there may be an impact on the operation of burglar and medical alarms, particularly monitored alarms. [Note: check with your alarm provider or telecommunications service provider] -
I have read and agree to Enable's End User Terms
-
I understand and approve the methodology of works for my fibre install
-
Authorised Signature :
-
Enable Representative:
-
We will carry out the work in accordance with Enable End User Terms (http://www.enable.net.nz/about-enable/governance/ufb-reference-offer.html ).