Information

  • SimPRO No :

  • Enable Ref No :

  • Customer Address:

  • Plan Completed by :

  • Date Completed :

PLAN DETAILS

Customer / Job Details

  • Customer Name & Contact Number

  • Type of installation?

H&S / SITE HAZARD INFO

  • Working at Heights Required?

  • Provide details (e.g. if EWP required etc)

  • Gas Present?

  • If Gas is present then the Plan MUST avoid the Gas Exclusion zone (refer to the Enable Standards for details)

  • Dogs on site?

  • Action Required :

  • SACM on site?

  • Provide Details / Location

  • Any other hazards on site?

  • Please provide details of other hazards

CIVIL DETAILS

  • Is CIVIL Required?

  • Road Level Category

  • FAP Sighted

  • Tube (at FAP) Sighted

  • Does the Customer have any specific local utilities?

  • FENCELINE Distance (Metres)

  • TRENCH (SOFT SURFACE) Distance (Metres) - Includes Hand Dig, Terra Saw etc

  • TRENCH (LANDSCAPED) Distance (Metres) - Includes Stones, bark, weedmat, plants / shrubs etc

  • SLOT CUT (ASPHALT) Distance (Metres)

  • SLOT CUT (CONCRETE) Distance (Metres)

  • TRENCH (ASPHALT) Distance (Metres)

  • TRENCH (CONCRETE) Distance (Metres)

  • Default Metres (Radial)

  • Actual Metres (FAP - ETP)

  • Reason for Variation (if Default & Planned Distance varies) :

  • Additional Notes for Civil Tech

PREMISE INSTALL DETAILS

  • Is any Premise Installation work required?

  • IMPORTANT NOTE: SACM (if present) is captured in the H&S / HAZARD INFO Section

  • Does the Customer have a Media Panel?

  • ETP to ITP / ONT Distance (Metres)

  • Distance in Ceiling (Metres)

  • Distance Under Floor (Metres)

  • Proved End to End Route is Accessible

  • Access Issue Details (if any)

  • Phone Integration / Copper Cutover Required

  • Install Type

  • Additional Notes for Install Tech

PHOTOS

  • Screen Shot of Property from Webmaps - https://www.enable.net.nz/maps

  • Photos - Outline of Works (Civil - FAP to ETP and Internals = ETP to ONT / RGW position)

SAMPLES OF COMPLETED WORK

  • Fenceline

  • Fenceline - Sign as Agree

  • Slot Cut - Asphalt / Concrete

  • Slot Cut - Sign as Agree

  • Trench

  • Trenching - Sign as Agree

SIGNED CONSENT

  • I confirm that:
    - I have seen, read and understood this information and the end user terms and accept those terms; and
    - If I am not the owner of the property, I have obtained the consent of the owner for the installation works; and
    - I understand that there may be an impact on the operation of burglar and medical alarms, particularly monitored alarms. [Note: check with your alarm provider or telecommunications service provider]

  • I have read and agree to Enable's End User Terms

  • I understand and approve the methodology of works for my fibre install

  • Authorised Signature :

  • Enable Representative:

  • We will carry out the work in accordance with Enable End User Terms (http://www.enable.net.nz/about-enable/governance/ufb-reference-offer.html ).

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.