Title Page
-
Conducted on
-
Site address & Job number
-
Client
-
Prepared by
-
Document number
The condition of the mobile tower , scaffold must be inspected and recorded prior to use .Defective equipment MUST NOT be used
-
Identification number
Inspection
-
Have competent persons been in charge of erection / installation ?
-
Is a copy of the manufactures assembly instruction available ?
-
Are the castors of suitable size with effective locking devices ?
-
Do the castors roll freely & lock securely ?
-
Is the maximum permitted load ( MPL ) of the scaffold known ?
-
Has the MPL been communicated to all users / potential user ?
-
is the ground location capable of taking the combined weight of the scaffold and its loading ?
-
Is the tower level or plumb ?
-
Is the tower height less than 4 times the minimum base width ?
-
Is the tower braced on all sides ?
-
Have stabilisers / outriggers been fixed to the tower ?
-
Have the stabalisers / outriggers in firm contact with the ground ?
-
Are the stabilisers / outriggers at full spread to maximise stability ?
-
Are the guardrails and the toe boards installed and secured ?
-
Is the working platform board correctly located with the access hatch adjacent to the internal ladder 0r staircase ?
-
Is the scaff tag clearly displayed and in date if complete and fit for purpose ?
-
If the scaff tag is incomplete or has been inspected within the last 7 days has the scaff tag been removed ?