Title Page
-
Conducted on
-
Prepared by
-
Location
-
Job Number and Name
-
Serial Number on Unit
Check Sheet
Checklist
-
Is the coach prepared with CORRECT structural steel for lift to be mounted (Box rear brackets will be subject to over 3 tonnes of force UP each)
-
Is all structural steel work correctly painted / undersealed (No raw steel used)
-
All 4 lift brackets fixed to cassette with CORRECT length track bolts
-
Mounting bolts in each bracket are: M10 or M12 (2 off) OR M16 or M20 (1 off) each bracket
-
Are Nyloc nuts used on the bolts?
-
External box hose & cable correct length, routed and secured (Additional length can be coiled up if safe to do so)
-
Powerpack mounted securely enough to be manually pumped
-
Powerpack mounted fully 'plug & play' (easy to swap out in service, all plugs at pump end)
-
Powerpack pump handle correctly clipped in
-
Powerpack OIL topped up to correct level
-
Auxiliary handset plug fitted in convenient place to operate lift
-
Bridging plate does not impede with locker flap / cover
-
Handset clean and wired correctly (Fully tested)
-
Handset holster fitted
-
Lift UP height correctly set to vehicle floor height
-
Bridging plate landing ON vehicle floor (No gap or trip hazard)
-
Platform extension end correctly lands on GROUND (Loaded and unloaded)
-
Recheck floor height and bridgeplate setting to vehicle floor (completed with and without weight)
-
Lift clean and lubricated (correct ACF50 or silicone)
-
Photographs taken of complete installation (Inc all worked on parts)
-
Fitter Name & Signature: