Site Details

  • Site / Address

PE Riser Isolation

  • Do you wish to examine PIV work areas on this MOBS PE RISER SURVEY?

  • Has a PIV been installed outside the building to enable isolation of the building complex? (G5 ref 7.3.1)

  • Has the PIV got the correct valve cover? (G5 ref 7.3.3)

  • Can the PIV be permanently identified? (G5 ref 7.3.3)

  • Has the PIV got the correct valve cover? (G5 ref 7.3.3)

  • Is the PIV accessible to enable isolation? (G5 ref 7.3.3)

Riser Condition

  • Do you wish to examine riser work areas on this MOBS PE RISER SURVEY?

  • Is PE riser pipe / fittings shrouded and protected from sunlight? (G5 ref 6.1.8)

  • Is the PE riser / laterals protected from accidental damage, tampering & vandalism? (G5 ref 6.4.1.2)

  • Is the riser correctly supported?

Building Works / Alterations

  • Do you wish to examine building works / alterations work areas on this MOBS PE RISER SURVEY?

  • Have any building works / alterations taken place since PE riser was installed?

  • Have building works / alterations compromised the safety of the PE riser system? (e.g.. Built over / Cladding / External Insulation / Rendering)

  • Are house entry tee isolation (Internal Stoppers) accessible? (i.e. via scaffolding or other working at height equipment if applicable)

ECV (Emergency Control Valves)

  • Do you wish to examine ECV work areas on this MOBS PE RISER SURVEY?

  • Has an ECV been installed on the inlet to each individual meter installation? (G5 ref 7.7.1)

  • Is the ECV suitable for the network pressure? (G5 ref 7.7.3)

  • Is the ECV key or lever securely attached to the operating spindle? (G5 ref 7.7.4)

General Comments

  • Any further comments or recommendations arising from this inspection?

  • Add any additional relevant photos

  • Have all required corrective actions been added as Actions to this inspection?

  • Please add any corrective actions to the appropriate questions above before completing this report

Sign Off

  • Name & Signature of Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.