Information
-
Cinema:
-
Conducted on:
-
Vue Week no:
-
Month / Year
FIRE ALARM ACTIVATION TEST
Emergency Lighting - Energise the lights for 5 minutes by simulating a failure of the mains power supply
-
Emergency lighting working in all screens
-
Initials of the checker
-
Date of check
-
Emergency lighting working in all public areas
-
Initials of the checker
-
Date of check
-
Emergency lighting working in all evacuation routes and above all fire doors
-
Initials of the checker
-
Date of check
-
Emergency lighting working in all staff areas, stores and preparation areas
-
Initials of the checker
-
Date of check
-
Stage 1 alarm activated and audible
-
Initials of the checker
-
Date of check
-
Stage 2 alarm activated and audible
-
Initials of the checker
-
Date of check
-
Stage 3 alarm activated and audible
-
Initials of the checker
-
Date of check
-
Heating and ventilation systems shut down at appropriate stage
-
Initials of the checker
-
Date of check
-
Alarm panels function correctly
-
Initials of the checker
-
Date of check
-
Projectors stop and revert to standby mode
-
Initials of the checker
-
Date of check
-
Automatic door releases operate at the appropriate stage
-
Initials of the checker
-
Date of check
-
Emergency door release mechanisms to secure staff areas operate in an emergency
-
Initials of the checker
-
Date of check
-
Fire dampers / shutters close at the appropriate stage
-
Initials of the checker
-
Date of check
-
Where applicable the red care line is working
-
Initials of the checker
-
Date of check
-
Lifts return to the ground floor and open doors
-
Initials of the checker
-
Date of check
-
TV screens and poster cases shut down or turn off at the appropriate stage
-
Initials of the checker
-
Date of check
-
Escalators shut down at the appropriate stage
-
Initials of the checker
-
Date of check
-
Six monthly evacuation drill completed
-
Initials of the checker
-
Date of the last evacuation drill
-
Date of check
HEALTH & SAFETY
-
Only company approved cleaning chemicals in use
-
Initials of the checker
-
Date of check
-
Face screen, gloves and apron available for xenon bulb changes
-
Initials of the checker
-
Date of check
-
First aid boxes, including spills and sharps kits, checked and stocked
-
Initials of the checker
-
Date of check
-
Contractors and visitors using signing in book correctly
-
Initials of the checker
-
Date of check
-
Sentinel cold water temperatures below 20 degrees centigrade after 2 minutes (record temp)
-
Temperature recorded (degrees centigrade)
-
Initials of the checker
-
Date of check
-
Sentinel hot water temperatures above 50 degrees centigrade after 1 minutes (record temp)
-
Temperature recorded (degrees centigrade)
-
Initials of the checker
-
Date of check
-
Shower heads descaled and disinfected
-
Initials of the checker
-
Date of check
CORRECTIVE ACTIONS
-
Corrective Actions
Corrective action
-
Details of the corrective action
-
Photo(s) of the corrective action
-
Who is responsible for completion
-
When will the issue be rectified
-
Date of completion
-
Initials of the checker, once complete
All checks have been completed and corrective actions recorded for all non compliances
-
GM's signature