Information
-
Location: Ripon Plant
-
Document No.
-
Add Area of Audit
-
Prepared by
- Carol Wurech
- Cindy Shaffer
- Beccy Jorgensen
- Jason Heiling
- Dennis Hopp
- Melissa Freismuth
- Cris Trapp
- Karen Johnson
- Cindy Shaffer
- Pete Astrach
- Edi Helmuth
- Rhonda Krueger
- Kristie Krause
- Karla Schmul
- Mary Lou Yerk
- Jerry Jansky
- Dan Stokes
- Brienna Ramal
-
Conducted on
Area Maintenance, Parts Cage, Tooling Repair, Engineering, Compressor Rm
-
Exterior walls (18" white line) kept clean and free of obstruction<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
5S followed; everything stored in appropriate locations, lines not cluttered<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
All aprons, gloves, etc are kept in designated area when not in use<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
All cardboard is clean and dated <br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
All chemicals and compounds completely segregated from raw materials and product<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
All chemicals and secondary containers must be labeled<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
All chemicals are put in the correct locations<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
All cleaning supply cabinets are locked and labeled<br><br><br>
-
All cleaning supply cabinets are locked and labeled<br><br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
All entry into plant secured - check doors<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
All necessary holes in walls, open-ended conduit, piping, etc., sealed to prevent pest or rodent nesting<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date completed
-
All supply cabinets are locked and/or labeled<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Chemical inventories are correct and updated<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Control of dust, condensation on overhead structures and pipes<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Fan filters are on and clean<br><br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Hoses do not contact floor<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Labels are marked out on re-used gaylords, new labels applied<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Light traps operational and reasonably clean<br><br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Machinery free of grease, dirt, and chipped paint that could come in contact with product<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Make shift devices such as tape, cardboard, wire, etc., not used on equipment as a permanent fix<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Materials stored or elevated off of floor<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
No articles in pockets above the waist<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
No broken or damaged pallets<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
No burned out lights or damaged covers<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
No food or food containers placed in trash containers in manufacturing areas<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
No Personal articles allowed<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
No tape anywhere; not used as marker or labeling<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
No use of finished product in area<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
No use of finished product in segregated area and identified properly<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Proper PPE being used.<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Rags are inside their bags and no rags touching the outside of the barrels<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Rodent traps present, placed against the wall, and in good condition<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Sinks are kept separate and labeled for hand washing/utensils<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Trash/Recyclables in correctly labeled bins and covered<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Use the question list to "interview" at least 2 employees, include in your comments which questions were asked, the response given, and the position of the person asked.<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Walls and roof free of holes or cracks<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Walls and roof free of holes or cracks<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
-
Other: Explain<br>
-
Person Assigned Corrective Action and Target Date
-
Date Completed
Area Chemical Room and Flammable Room
-
Are two products in the chemical room on the chemical approval list? List chemicals that you audited
-
Are the quantities correct on the inventory list?
-
Are two products in the Flammable room on the chemical approval list? List Flammable that you audited
-
Are the quantities correct on the inventory list?
-
Add media
-
Add signature
-
Add signature
-
When Audit is complete, Email audit to cindy.goehring@polyone.com and charlene.frost@polyone.com