Title Page
-
Department conducted
-
Work Area conducted
-
Conducted on
-
Prepared by
-
Racking Aisle Location
- AA
- AB
- AC
- AD
-
Draw on this image any damage observed. Then add a photo in the action raised to rectify the issue
Base Plates
-
What is the status of the front floor fixings - Uprights to base plate fixed twisted/loose?
-
It is required that an action is raised to rectify the issue
-
What is the status of the rear Floor Fixings - Upright to base plate fixing - Twisted, loose?
-
It is required that an action is raised to rectify the issue
-
What is the status of the front Levelling Plate - Shims damaged or twisted?
-
It is required that an action is raised to rectify the issue
-
What is the status of the rear Levelling plate - Shims damaged or twisted?
-
It is required that an action is raised to rectify the issue
-
Are the base plates bolted into the floor (Front and Rear)
-
It is required that an action is raised to rectify the issue
-
Are all Safety Locks in place?
-
It is required that an action is raised to rectify the issue
Beams
-
What is the status of the Front Beams - Dislodged, damaged or missing
-
It is required that an action is raised to rectify the issue
-
What is the status of the Rear Beams - Dislodged, damaged or missing
-
It is required that an action is raised to rectify the issue
-
Are all Safety Locks in place? (Front and Rear)
-
It is required that an action is raised to rectify the issue
Frame Braces
-
Is there any horizontal Damage to the front braces?
-
Extent of issue
- 0-10mm - Record damage and continue to monitor
- 10-20mm - Must repair in 4wks - Escalate to red if not!
- >20mm - Immediately offload all bays, don't use until repaired.
-
It is required that an action is raised to rectify the issue
-
Is there any diagonal Damage to the front braces?
-
Extent of issue
- 0-10mm - Record damage and continue to monitor
- 10-20mm - Must repair in 4wks - Escalate to red if not!
- >20mm - Immediately offload all bays, don't use until repaired.
-
It is required that an action is raised to rectify the issue
-
Are the column Guards Damaged or fixings loose/missing?
-
It is required that an action is raised to rectify the issue
-
Has the direction the diagonal braces been installed correctly as to provide additional strength to the upright?
-
Have the braces been fitted in the correct direction?
-
It is required that an action is raised to rectify the issue
Uprights
-
Is there any vertical damage to the upright, e.g twisted or dented?
-
Are the uprights bent into the racks?
-
What is the extent of deflection?
- 0-3mm - Record damage and continue to monitor
- 3-6mm -Must repair in 4wks - Escalate to red if not.
- >6mm - Immediately offload all bays. Don't use until repaired
-
It is required that an action is raised to rectify the issue
-
Are the uprights bent parallel to the beam?
-
What is the extent of deflection?
- 0-5mm - Record damage and continue to monitor
- 5-10mm - Must repair in 4wks - Escalate to red if not.
- >10mm - Immediately offload all bays. Don't use until repaired.
-
It is required that an action is raised to rectify the issue
Shelves
-
Are shelves fitted?
-
Are baseboards/metal shelves in good condition and suitable?
-
It is required that an action is raised to rectify the issue
Stored Pallets
-
Are loads and pallets placed correctly and safely?
-
It is required that an action is raised to rectify the issue
Additional Remarks
-
ADDITIONAL REMARKS
-
-
Draw on this image any damage observed. Then add a photo in the action raised to rectify the issue
Base Plates
-
What is the status of the front floor fixings - Uprights to base plate fixed twisted/loose?
-
It is required that an action is raised to rectify the issue
-
What is the status of the rear Floor Fixings - Upright to base plate fixing - Twisted, loose?
-
It is required that an action is raised to rectify the issue
-
What is the status of the front Levelling Plate - Shims damaged or twisted?
-
It is required that an action is raised to rectify the issue
-
What is the status of the rear Levelling plate - Shims damaged or twisted?
-
It is required that an action is raised to rectify the issue
-
Are the base plates bolted into the floor (Front and Rear)
-
It is required that an action is raised to rectify the issue
-
Are all Safety Locks in place?
-
It is required that an action is raised to rectify the issue
Beams
-
What is the status of the Front Beams - Dislodged, damaged or missing
-
It is required that an action is raised to rectify the issue
-
What is the status of the Rear Beams - Dislodged, damaged or missing
-
It is required that an action is raised to rectify the issue
-
Are all Safety Locks in place? (Front and Rear)
-
It is required that an action is raised to rectify the issue
Frame Braces
-
Is there any horizontal Damage to the front braces?
-
Extent of issue
- 0-10mm - Record damage and continue to monitor
- 10-20mm - Must repair in 4wks - Escalate to red if not!
- >20mm - Immediately offload all bays, don't use until repaired.
-
It is required that an action is raised to rectify the issue
-
Is there any diagonal Damage to the front braces?
-
Extent of issue
- 0-10mm - Record damage and continue to monitor
- 10-20mm - Must repair in 4wks - Escalate to red if not!
- >20mm - Immediately offload all bays, don't use until repaired.
-
It is required that an action is raised to rectify the issue
-
Are the column Guards Damaged or fixings loose/missing?
-
It is required that an action is raised to rectify the issue
-
Has the direction the diagonal braces been installed correctly as to provide additional strength to the upright?
-
Have the braces been fitted in the correct direction?
-
It is required that an action is raised to rectify the issue
Uprights
-
Is there any vertical damage to the upright, e.g twisted or dented?
-
Are the uprights bent into the racks?
-
What is the extent of deflection?
- 0-3mm - Record damage and continue to monitor
- 3-6mm -Must repair in 4wks - Escalate to red if not.
- >6mm - Immediately offload all bays. Don't use until repaired
-
It is required that an action is raised to rectify the issue
-
Are the uprights bent parallel to the beam?
-
What is the extent of deflection?
- 0-5mm - Record damage and continue to monitor
- 5-10mm - Must repair in 4wks - Escalate to red if not.
- >10mm - Immediately offload all bays. Don't use until repaired.
-
It is required that an action is raised to rectify the issue
Shelves
-
Are shelves fitted?
-
Are baseboards/metal shelves in good condition and suitable?
-
It is required that an action is raised to rectify the issue
Stored Pallets
-
Are loads and pallets placed correctly and safely?
-
It is required that an action is raised to rectify the issue
-
Draw on this image any damage observed. Then add a photo in the action raised to rectify the issue
Base Plates
-
What is the status of the front floor fixings - Uprights to base plate fixed twisted/loose?
-
It is required that an action is raised to rectify the issue
-
What is the status of the rear Floor Fixings - Upright to base plate fixing - Twisted, loose?
-
It is required that an action is raised to rectify the issue
-
What is the status of the front Levelling Plate - Shims damaged or twisted?
-
It is required that an action is raised to rectify the issue
-
What is the status of the rear Levelling plate - Shims damaged or twisted?
-
It is required that an action is raised to rectify the issue
-
Are the base plates bolted into the floor (Front and Rear)
-
It is required that an action is raised to rectify the issue
-
Are all Safety Locks in place?
-
It is required that an action is raised to rectify the issue
Beams
-
What is the status of the Front Beams - Dislodged, damaged or missing
-
It is required that an action is raised to rectify the issue
-
What is the status of the Rear Beams - Dislodged, damaged or missing
-
It is required that an action is raised to rectify the issue
-
Are all Safety Locks in place? (Front and Rear)
-
It is required that an action is raised to rectify the issue
Frame Braces
-
Is there any horizontal Damage to the front braces?
-
Extent of issue
- 0-10mm - Record damage and continue to monitor
- 10-20mm - Must repair in 4wks - Escalate to red if not!
- >20mm - Immediately offload all bays, don't use until repaired.
-
It is required that an action is raised to rectify the issue
-
Is there any diagonal Damage to the front braces?
-
Extent of issue
- 0-10mm - Record damage and continue to monitor
- 10-20mm - Must repair in 4wks - Escalate to red if not!
- >20mm - Immediately offload all bays, don't use until repaired.
-
It is required that an action is raised to rectify the issue
-
Are the column Guards Damaged or fixings loose/missing?
-
It is required that an action is raised to rectify the issue
-
Has the direction the diagonal braces been installed correctly as to provide additional strength to the upright?
-
Have the braces been fitted in the correct direction?
-
It is required that an action is raised to rectify the issue
Uprights
-
Is there any vertical damage to the upright, e.g twisted or dented?
-
Are the uprights bent into the racks?
-
What is the extent of deflection?
- 0-3mm - Record damage and continue to monitor
- 3-6mm -Must repair in 4wks - Escalate to red if not.
- >6mm - Immediately offload all bays. Don't use until repaired
-
It is required that an action is raised to rectify the issue
-
Are the uprights bent parallel to the beam?
-
What is the extent of deflection?
- 0-5mm - Record damage and continue to monitor
- 5-10mm - Must repair in 4wks - Escalate to red if not.
- >10mm - Immediately offload all bays. Don't use until repaired.
-
It is required that an action is raised to rectify the issue
Shelves
-
Are shelves fitted?
-
Are baseboards/metal shelves in good condition and suitable?
-
It is required that an action is raised to rectify the issue
Stored Pallets
-
Are loads and pallets placed correctly and safely?
-
It is required that an action is raised to rectify the issue
-
Draw on this image any damage observed. Then add a photo in the action raised to rectify the issue
Base Plates
-
What is the status of the front floor fixings - Uprights to base plate fixed twisted/loose?
-
It is required that an action is raised to rectify the issue
-
What is the status of the rear Floor Fixings - Upright to base plate fixing - Twisted, loose?
-
It is required that an action is raised to rectify the issue
-
What is the status of the front Levelling Plate - Shims damaged or twisted?
-
It is required that an action is raised to rectify the issue
-
What is the status of the rear Levelling plate - Shims damaged or twisted?
-
It is required that an action is raised to rectify the issue
-
Are the base plates bolted into the floor (Front and Rear)
-
It is required that an action is raised to rectify the issue
-
Are all Safety Locks in place?
-
It is required that an action is raised to rectify the issue
Beams
-
What is the status of the Front Beams - Dislodged, damaged or missing
-
It is required that an action is raised to rectify the issue
-
What is the status of the Rear Beams - Dislodged, damaged or missing
-
It is required that an action is raised to rectify the issue
-
Are all Safety Locks in place? (Front and Rear)
-
It is required that an action is raised to rectify the issue
Frame Braces
-
Is there any horizontal Damage to the front braces?
-
Extent of issue
- 0-10mm - Record damage and continue to monitor
- 10-20mm - Must repair in 4wks - Escalate to red if not!
- >20mm - Immediately offload all bays, don't use until repaired.
-
It is required that an action is raised to rectify the issue
-
Is there any diagonal Damage to the front braces?
-
Extent of issue
- 0-10mm - Record damage and continue to monitor
- 10-20mm - Must repair in 4wks - Escalate to red if not!
- >20mm - Immediately offload all bays, don't use until repaired.
-
It is required that an action is raised to rectify the issue
-
Are the column Guards Damaged or fixings loose/missing?
-
It is required that an action is raised to rectify the issue
-
Has the direction the diagonal braces been installed correctly as to provide additional strength to the upright?
-
Have the braces been fitted in the correct direction?
-
It is required that an action is raised to rectify the issue
Uprights
-
Is there any vertical damage to the upright, e.g twisted or dented?
-
Are the uprights bent into the racks?
-
What is the extent of deflection?
- 0-3mm - Record damage and continue to monitor
- 3-6mm -Must repair in 4wks - Escalate to red if not.
- >6mm - Immediately offload all bays. Don't use until repaired
-
It is required that an action is raised to rectify the issue
-
Are the uprights bent parallel to the beam?
-
What is the extent of deflection?
- 0-5mm - Record damage and continue to monitor
- 5-10mm - Must repair in 4wks - Escalate to red if not.
- >10mm - Immediately offload all bays. Don't use until repaired.
-
It is required that an action is raised to rectify the issue
Shelves
-
Are shelves fitted?
-
Are baseboards/metal shelves in good condition and suitable?
-
It is required that an action is raised to rectify the issue
Stored Pallets
-
Are loads and pallets placed correctly and safely?
-
It is required that an action is raised to rectify the issue
Sign Off
-
Summary and Signoff