  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Untitled Page

  • Sheet1

  • H&S Monthly Site Safety Inspection ML

  • Site:

  • Site Address:

  • Site Manager:

  • Name of Auditor:

  • Average Number of Operatives on site

  • Overall Score :

  • Date of Audit:

  • Site Conditions:

  • Section 1

Site Office Notice Board

  • Score

  • Actions

  • Health & Safety & Environmental Policies

  • Health & safety Law Poster

  • Employers Liability Insurance Displayed & in Date

  • Current Health & Safety Alerts Displayed

  • F10 Current & Displayed

  • Other Policies Displayed

  • Possible

  • Actual

  • Sub Total

  • Section 2

  • Registers

  • Score

  • Actions

  • Scaffold Commissioning , Weekly, etc

  • Excavation Daily/Weekly Inspections

  • Lifting Appliances

  • Plant & Equipment

  • Electrics

  • Site Contractors Register

  • Visitors Book

  • Possible

  • Actual

  • Sub Total

  • Section 3

  • H&S Documentation

  • Score

  • Actions

  • Regularly Reviewed

  • Risks Identified

  • Risk Assessment Completed

  • Method Statements signed & dated

  • Compliance with MS

  • H & S Organisation Chart current

  • Route to hospital

  • Permit to Dig

  • Permit to Lift (inc lifting plan)

  • Permit to Enter (daily)

  • Weekly Plant Inspections (date of last)

  • Plant Operators Certs

  • Site traffic plan displayed & current

  • Accident Reports

  • Near Miss Reports

  • PPE register maintained (location & last entry)

  • OAF’s Signed & Dated for each Subcontractor

  • Project Management Sheets 1&2 completed

  • Drugs & Alcohol Consent Forms & Testers Available

  • Possible

  • Actual

  • Sub Total

  • Section 4

  • Welfare

  • Score

  • Actions

  • Canteen

  • Drying Room

  • Toilets

  • Lockers

  • Possible

  • Actual

  • Sub Total

  • Section 5

  • Site Entry/Exit

  • Score

  • Actions

  • Safety of Traffic signage & controlled

  • Safety of Public signage, segregation

  • Possible

  • Actual

  • Sub Total

  • Section 6

  • Site Tidiness

  • Score

  • Actions

  • Perimeter Hoarding

  • Fencing

  • General

  • Work Areas

  • De nailling

  • Storage

  • Pedestrian Walkways

  • Slip, trip & fall risks

  • Possible

  • Actual

  • Sub Total

  • Section 7

  • Fire Precautions

  • Score

  • Actions

  • Office Extinguishers In date

  • Hot Works Extinguishers available & in date

  • Hot works permits in use

  • Conditions on site

  • Storage of flammables

  • Assembly Point clear signage & safe

  • Means of raising the alarm

  • Clearly identified emergency routes

  • Possible

  • Actual

  • Sub Total

  • Section 8

  • PPE

  • Score

  • Actions

  • Helmets worn & in date (less than 3yrs old )

  • Safety footwear worn & adequate (safety toecap & midsole)

  • Hiviz worn & correct for application

  • Additional PPE worn as per risk assessment

  • Other

  • Gas Monitors used & in calibration

  • Possible

  • Actual

  • Sub Total

  • Section 9

  • CoSHH

  • Score

  • Actions

  • CoSHH assessments available for for products used on site

  • CoSHH products stored correctly

  • Possible

  • Actual

  • Sub Total

  • Section 10

  • Plant

  • Score

  • Actions

  • Planning/Selection of plant

  • Competent Operator (CPCS or equivalent)

  • Traffic Management

  • Guarding Arrangements

  • Vehicle checks being undertaken & plant in good condition (Select item & check)

  • 12/6 Monthly Examination Certification Available & in date

  • Safe use of plant witnessed including the use of seatbelts & dismounting whilst being loaded. Challenge Green

  • Condition of lifting gear

  • Condition of Skips (check locking mechanism & general condition)

  • Location of skips to prevent bombing

  • Possible

  • Actual

  • Sub Total

  • Section 11

  • Excavations

  • Score

  • Actions

  • Planning/Selection of plant

  • Provision for the location of services CAT & Genny/ Service Drawings

  • Edge protection available & used correctly

  • Shoring Available & used correctly

  • Safe access & egress including at the weekends

  • Fencing available & used to prevent unauthorised access to any open excavations during break times, evenings & weekends

  • Possible

  • Actual

  • Sub Total

  • Section 12

  • Electrics

  • Score

  • Actions

  • Condition of site distribution in test & weekly checks carried out

  • Overhead Lines identified safe clearance distance identified & displayed

  • Condition of equipment, leads, Extension leads, transformers etc

  • Competent persons ( ECS card/NVQ)

  • PAT testing in date

  • Circuits in plots safe, no bare or taped wires, fused spurs fuses removed, blanking plates in fuse boards, etc

  • Possible

  • Actual

  • Sub Total

  • Section 13

  • Work at Height

  • Score

  • Actions

  • Planning/Selection of equipment has the hierarchy been followed Avoid Prevent Minimise

  • Safe access

  • Scaffolding General Tagged/ Inspected

  • Platforms hop ups, etc

  • Edge protection, toeboards & brickguards in use

  • Ladders/Step Ladders inspected, in good condition Type EN131 Professional

  • Skip bays in use & to drawing

  • Other precautions

  • Possible

  • Actual

  • Sub Total

  • Section 14

  • Floor openings

  • Score

  • Actions

  • Planning

  • Provision of protection

  • Bean bags/crash deck fitted correctly, in place & clear of debris

  • Temporary hatches fitted as per drawing

  • Possible

  • Actual

  • Sub Total

  • Section 15

  • Confined Spaces

  • Score

  • Actions

  • Planning

  • Gas detection equipment available & used

  • Rescue equipment Winch tripod harness

  • Competent persons

  • Possible

  • Actual

  • Sub Total

  • Section 16

  • Compliance with Health & Safety

  • Score

  • Actions

  • Actions taken on H&S Audits

  • Promotion of Health & Safety

  • Date the last Monthly TBT was carried out

  • Possible

  • Actual

  • Sub Total

  • Section 17

  • Public Interface

  • Score

  • Actions

  • Safety of the public

  • Public information/interface

  • Traffic Management

  • Highway cleanliness

  • Possible

  • Actual

  • Sub Total

  • Section 18

  • Noise

  • Score

  • Actions

  • Identification of sources

  • Provision of silenced equipment

  • Monitoring required

  • Noise assessments undertaken

  • Possible

  • Actual

  • Sub Total

  • Section 19

  • Training & Inductions

  • Score

  • Actions

  • Staff

  • Operatives – Inductions, Medical form, CSCS/CPCS/NPORS copied, Manual Handling

  • Subcontractors – Inductions, Medical form, CSCS/CPCS/NPORS copied, Manual Handling

  • Training Identified

  • Possible

  • Actual

  • Sub Total

  • % for site H&S Performance

  • Total points possible

  • Total Points awarded

  • Actions Required & date required:

  • Actions Taken & date completed:

  • Each issue of the Audit Checklist is considered and awarded an audit score. To ensure the audit system in implemented in an objective and consistent way, the following system is used and adhered to: Overall Audit Rating

  • Each of the subsections of the Audit sheet will be totaled and a combined total will be achieved. This will be divided by the ‘possible total’ and the result multiplied by 100 to achieve a Total Percentage Rating for Site H&S Performance. 

  • Very Poor A percentage rating of 70% or less indicates that immediate action is required to improve safety performance and that an investigation by Site Managers may be necessary to determine and address the root causes of the weakness. 

  • Poor A percentage rating of between 71% and 80% indicates that there is a need for improvement in the very near future. 

  • Fair A percentage rating of between 81% and 90% indicates that the site has achieved an acceptable level of safety performance, but there is still room for improvement. 

  • Good A percentage rating of 91% to 95% indicates that the site is operating at a high level of health and safety performance with only minor issues to be resolved. 

  • Excellent A percentage rating of 96% or above indicates that the site is operating at a very high level of health and safety performance The scoring will be based on the following: 

  • Best Practice = 10 points The Site are achieving the highest standards of H&S management and implementing ‘best practice’ initiatives where possible. 

  • Good = 8 points Company and legislative requirements have been met, including ‘best practice’ standards where appropriate. 

  • Reasonable = 6 points Only just enough has been done to comply with legislative requirements and company procedures. However, greater effort should be made in order to reduce the potential for accidents and incidents. 

  • Improvement required = 4 points Not enough has been done to comply with legislative requirements or company procedures. 

  • Serious = 2 points

  • Serious failings requiring urgent improvement and to be actioned immediately. 

  • Critical = 0 points The Auditor is of the opinion that there is a risk of imminent and serious danger to the H&S of employees, or nonemployees, who may be affected by the undertakings and work must cease immediately. The details must be reported to the Site Manager and Relevant Director

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.