Title Page
-
Client
-
Contract No
-
Site Address where Asbestos Work is Being Carried out
-
Project Duration
-
Actual Start Date
-
Expected Finish Date
-
Exact Work Location of where in the premises asbestos work is being carried out
-
Prepared by
Removal Audit
-
INSTRUCTIONS
1. Answer the questions provided below.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Action, click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date.
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link -
Site pack, licence, accreditation AS/NZ 4801:2001 and insurance available?
-
Is hazard board onsite and Available<br>Is Hazard board filled out and covers all hazards
-
Completed ARCP / JSEA on site and available? If not STOP job
Documentation
-
Are they acceptable and completed inline with Morecroft procedures?
-
Sketch Plan available (Transit & Waste route identified if required)
-
All persons on site signed onto ARCP?
-
All changes notified to Worksafe?
-
Clients Permit to Work in place?
-
Details of Clients & Morecrofts emergency procedures available and communicated?
-
Pre-start Talks carried out & signed by all operatives?
-
Are any other license holders involved?
-
Do we have a copy of their Notification and ARCP?
Certificates
-
Pre-Start background air test certificates available
-
DCU clearance certificate from previous job
-
• Valid DOP certification for:
-
NPU
-
DCU
-
VAC
-
Valid test certification for all RPE
-
• Valid certification for operatives
-
Asbestos Medical
-
Face Fit
-
Asbestos Training
-
First Aid
-
Confined Space
-
Are there other operatives certificates?
-
Specify Other Certificates
Equipment
-
All equipment PAT tested and in date
-
Suitable and sufficient, in date fire extinguishers
-
First Aid box / First Aider on site
-
Scaffolds inspected and Scafftags in place
-
Hand tools in good condition
-
Ladders / Stepladders checked, tagged and taped
-
Correct PPE available for all operatives
-
Spare set of PPE available at airlock for emergencies
-
Spray equipment available and fully functional
Environment
-
Welfare arrangements adequate
-
Good housekeeping around a work area
-
Adequate lighting
-
Around work area
-
Transit route
-
Waste route
-
Waste skip
-
Weather conditions if external
-
Chemical hazards
Work Area
-
DCU set up and fully functional
-
Is 3 x stage mobile shower being used..
-
Has the 3 x stage mobile unit been assembled correctly
-
NPU set up and fully functional
-
Has the water management system been installed correctly and working
-
Is water management system filters clean
-
NPU filter pod sealed correctly and filter in place
-
Vac set up and fully functional
-
Work area
-
3rd stage of an airlock
-
2nd stage of bag lock
-
Clear viewing panels c/w suitable access?
-
In work area
-
Other than in the work area, are there any other area(s)/item that need to be checked?
-
Click "Add Area" to add places
Area
-
Area Name/Details
-
Is this area compliant of clear viewing panels c/w suitable access?
-
Is there a CCTV available ( if required this will depend on client and site requirements)
-
Adequate arrangements for working at height
-
Asbestos skip / lined truck- signage locked and secure
-
Effective barriers erected
-
Adequate signage erected to
-
Work area
-
Transit route
-
Waste route
-
Temp storage area
-
Are all flaps weighted on an airlock
-
Are cables sealed through an enclosure wall
-
Emergency exit highlighted c/w retractable knife [if required]
-
All scaffold clips & tube ends covered
-
All staples & timber covered
-
Mirror at an entrance to an airlock
-
Effective communication systems in place
-
Buckets of water/spray mist bottles
-
In work area for footwear
-
3rd stage of an airlock for masks
Live Work Enclosure
-
When was the smoke test carried out and witnessed?
-
Is the spray mist machine/spray mist bottles being used correctly?
-
Has the work started on the notified date which is?
-
Have all items inside the enclosure have been protected with polythene which is no being removed
-
Name of the supervisor on site, is he named on the ARCP????
-
Does the ARCP sketch match the enclosure?
-
Is the JSEA adequate and identify all risks?
-
Is the enclosure showing signs of Negative pressure?
-
Can you see NPUs and read dials on the NPU? Are they OK!!!
-
Are daily inspections being Carried out on the following and from what date
-
Enclosure
-
NPU
-
Vac’s
-
DCU
-
RPE full face
-
RPE ½ mask
-
Do doors of DCU close from 150mm?
-
Have you checked yourself?
-
Are the personnel monitoring of operatives being carried out, are readings satisfactory
-
Have all individuals on job been informed of results?
-
Are the leak reassurance monitoring being carried out and results available on site
-
Is the tent guardian available?
-
Is he wearing cover PPE / RPE if required
-
Look through the viewing panels or on the CCTV and observe the operatives, are they working safely?
-
What activity are they performing?
-
Can you see the whole of work area?
-
Is the area around the enclosure tidy?
-
What remedial work is required?
-
Are operatives within the enclosure wearing correct PPE / RPE as per ARCP?
-
Are there adequate spare PPE & filters?
-
Are emergency procedures displayed outside an enclosure
-
Carry thorough inspection of an enclosure and record any findings, including barriers and signage, state time and date
-
Inspect the waste route and check inside the waste skip. Are all bags double bagged
Completion
-
Additional Comments
-
Signature (Name & Signature)
-
Position