Information
-
Store Number:
-
Store Name:
-
Conducted on
Ad-Hoc Works Sign Off
Installation Details
-
Store Number:
-
Store Name:
-
Time on site
-
Engineer Name:
-
Have you called Mission Control to advise of arrival onsite?
-
IF no, why not?
-
Have RAMS been reviewed and understood.
-
Have all aspects of work been completed?
-
IF no, why not?
-
Insert photo of cabinet after works completed
-
List switch ports used for Logwood
-
Insert photo of Chef Screen and bump bar
-
Enter Serial number of Pik Box for Chef Screen
-
Enter Serial number of Bump Bar for Chef Screen
-
Insert photo of power and data for chef screen
-
Insert photo of Servery Screen and bump bar
-
Enter Serial number of Pik Box for Servery Screen
-
Enter Serial number of Bump Bar for Servery Screen
-
Insert photo of power and data for servery screen
-
Has an additional power socket been installed for a new Microwave position?
-
Please insert Photo
-
Have Cafe Tills power cables been changed to Elecktrak plug tops?
-
IF no, why not?
-
How many Elecktrack plugs have been used?
-
Have Mission Control/Level 2 advised that the Logwood system has tested correctly?
-
IF no, why not?
-
List any issues encountered whilst onsite
-
Has the site been cleaned to the standard of which it was upon arrival?
-
IF no, why not?
-
Time Leaving site
Customer Sign Off
Customer Sign Off
-
Elecomm Engineer Sign Off:
-
Store Manager/Supervisor Signature - Signature is taken as acceptance of work completed by the engineer