Information
-
Customer Site Name
-
Customer Site Name
-
Conducted on
-
Document No.
-
Auditor
General Information
-
SABRE No
-
Total Staff on Site
-
Motivair Staff on Site
-
SPIC Name
-
Other Staff Names
-
Sub Contractor Names
-
Activity Details
Assessment and Notes
GP = Good Practice, C = Compliant, NC = Non Compliant, N/A = Not Applicable
Site Management
-
Parking ok? Has SPIC show good management of site, understand role, is the relevant paperwork available. Have the escape routes, hospital access and muster points been explained
Access
-
Is area controlled, signage/area taped off
Risk Assessments
-
Have all the Hazards been identified, control measures input and being worked to
Method Statement
-
Is the Method Statement/Safe Systems of Work available to site requirements. If not then STOP work and Scope of Work is correct
Documentation
-
Is Documentation available and controled for easy access
Signage and Access
-
Is any Mandatory Signage being displayed
First Aid
-
Is there First Aid Coverage on Site. Check Method Statement for requirements
PPE
-
Is PPE being worn, (eye protection, Hi-viz, safety boots, Hard Hats, Bump Caps, Gloves, Ear Defenders) Generally Site Specific. Check Safe Systems of Work
COSHH
-
Are engineers aware of Hazards, with substances. Are relevant COSHH sheets/assessmets available. Are engineers aware of PPE relevant to substances
Spills
-
Are engineers aware of Control Measures. Are Spill Kits available
Manual Handling
-
Do operatives understand Hazards associated with MH. Are mechanical aids required
Noise (occupational)
-
Is noise an issue. Are there control measures in place
Vibration
-
Is there equipment being used that generates vibration. If Yes, are control measures understood
Welfare
-
Are there facilities available on site
Lifting
-
Is there a requirement for lifting equipment. If equipment being used - check certification is in date
Confined Spaces
-
Check confined space procedures and entry permit if required. How is communication being monitored
Working at Height
-
Check specific risknassessment control measures. Is equipment in date for test, check certification. Is it suitable for task
Electrical
-
Is isolation required, check Safe Systems of Work. Has the supply benn isolated. Is certification required, check qualification
Tools and Equipment
-
All in good working order. PAT Test required on electrical equipment. Check calibration of test equipment. Check ladders and podiums tagged with inspection date
Storage
-
Items stored correctly and safely. Is there a site specific storage licence required
Fire
-
Aware of emergency procedues, muster and assembly points, Evacuation routes
House Keeping
-
Area clean and tidy, waste removed, anything left to be stored correctly. Tools and equipment tidy - trip hazards
Asbestos
-
Is Asbestos likely to be disturbed during work. Has the SPIC made staff aware of the hazards. What to do if found, check traing
inspection Commeents
-
Inspection Comments - Observations - Issues - (add photograpghs where required)
-
Add photographs
-
Auditor Signature