Information
-
Document No.
-
Moulding machine emergency isolation checks
-
Visy PET Albany
-
Conducted on
-
Prepared by:
- Mike Watson
- Preston Paige
- Melner Salvador
- Jaco Coetzee
- Shane Corbett
- Paul Whittaker
- Ismail Achemial
- Alistair Fulton
- Kerry May
- Ngaro Tiro
- Akapusi Tuifuaivaha
-
Personnel
-
Which machine is this audit for ?
- I01
- I02
- I03
- I04
- I05
- I06
- I07
- I08
- S01
- S02
- S03
- S04
- S05
- S07
- S08
- S09
- S10
- S11
- S12
- S13
- S14
- S15
- IM1
- IM2
- IM3
- IM4
- IM5
- IM6
- BM1
- BM2
- BM3
- BM4
Emergency stop buttons
-
Whilst dry cycling the machine, functionally test each emergency stop for correct operation. Continue checking all emergency stops until completed. If any fail, record details below and lockout machine until fixed.
Interlocks
-
Visually inspect each guard interlock for any damage. Continue checking all interlocks until completed. If any fail, record details below and lockout machine until fixed.
-
Whilst dry cycling the machine, functionally test each guard interlock for correct operation. Continue checking all interlocks until completed. If any fail, record details below and lockout machine until fixed.
Sign Off:
-
Signed (Technician):
-
Signed (shift leader):