Information
-
Document No.
-
Move-in Readiness
-
Housing York
-
Conducted on
-
Prepared by
-
Location
-
Personnel
KITCHEN AND BATHROOM
MOVE-OUT AUDIT
-
Address Select building
- Rose Town
- Evergreen Terrace
- Mapleview Terrace
- 76 Dunlop Pines
- 78 Dunlop Pines
-
Unit Number
-
Type of Inspection
- Move-In
- Move-out
- Annual
-
Inspected By:
KITCHEN
-
Kitchen Shape
-
Replace floor with vinyl plank.<br>Approximate area?
-
Replace floor with vinyl composite floor tiles.<br>Approximate area?
-
Replace floor with sheet vinyl.<br>Approximate area?
-
Replace Light Fixture
- 1
- 2
- 3
- 4
-
Replace Light Switch
- 1
- 2
- 3
- 4
-
Replace GFI
- 1
- 2
- 3
- 4
-
Replace Receptacle
- 1
- 2
- 3
- 4
-
Replace Single S/S Sink
- 1
- 2
- 3
- 4
-
Replace Double S/S Sink
- 1
- 2
- 3
- 4
-
Replace tapset
- 1
- 2
- 3
- 4
-
Replace Shut Off Valves
- 1
- 2
- 3
- 4
-
Paint ceiling
-
Paint walls
BATHROOM
-
Replace Vanity
-
<br>Replace vanity counter with cultured marble top.
-
Replace tapset
- 1
- 2
- 3
- 4
-
Replace Shut Off Valves
- 1
- 2
- 3
- 4
-
Replace Bath
-
Install Cultured Marble Bath Surround
-
Replace Shower Mixer Valve
-
Install new Shower Rail.
-
Replace WC and cistern.
-
Replace Shut Off Valves
- 1
- 2
- 3
- 4
-
Replace floor with vinyl plank.<br>Approximate area?
-
Replace floor with vinyl composite floor tiles.<br>Approximate area?
-
Replace floor with sheet vinyl.<br>Approximate area?
-
Replace Light Fixture
- 1
- 2
- 3
- 4
-
Replace Light Switch
- 1
- 2
- 3
- 4
-
Replace GFI
- 1
- 2
- 3
- 4
-
Replace Receptacle
- 1
- 2
- 3
- 4
-
Paint ceiling
-
Paint walls
BEDROOMS
BEDROOM 1
-
Check off hardware needing replacement
- Lock
- Latch
- Hinges
- Door Closer
-
Replace floor finish with Vinyl Plank<br>Approximate area.
-
Replace floor finish with Carpet<br>Approximate area.
-
Replace Closet Sliders
-
Replace Closet Bi Fold Doors
-
Replace Closet full size doors
-
Paint Ceiling
-
Paint Walls
-
Window Limiters<br>Install window limiters
BEDROOM 2
-
Check off hardware needing replacement
- Lock
- Latch
- Hinges
- Door Closer
-
Replace floor finish with Vinyl Plank<br>Approximate area.
-
Replace floor finish with Carpet<br>Approximate area.
-
Replace Closet Sliders
-
Replace Closet Bi Fold Doors
-
Replace Closet full size doors
-
Paint Ceiling
-
Paint Walls
-
Window Limiters<br>Install window limiters
BEDROOM 3
-
Check off hardware needing replacement
- Lock
- Latch
- Hinges
- Door Closer
-
Replace floor finish with Vinyl Plank<br>Approximate area.
-
Replace floor finish with Carpet<br>Approximate area.
-
Replace Closet Sliders
-
Replace Closet Bi Fold Doors
-
Replace Closet full size doors
-
Paint Ceiling
-
Paint Walls
-
Window Limiters<br>Install window limiters
Hallway
-
Replace Front Door
-
Check off hardware needing replacement
- Lock
- Latch
- Hinges
- Door Closer
-
Replace floor with Vinyl Plank<br>Approximate area.
-
Replace Closet Sliders
-
Replace Closet Bi Fold Doors
-
Replace Closet full size doors
-
Paint Ceiling
-
Paint Walls
SAFETY
-
Replace Smoke detectors?
-
Replace CO detectors?
-
Replace Door Closer?
-
Replace Window Restrictors?
-
Install GFI Receptacle?
Miscellaneous/Tenant renovations.
-
Tenant Renovations.
CONTRACTOR NOTES
-
Information for contractor.
SITE SUPERINTENDANT
-
Work to be completed by Site Superintendant.