Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select name of previous senior manager who last visited

  • On what date was the last visit?

  • Of the items that required action at the previous visit are there any outstanding action ( supply details)

Site consultation items discussed

  • Items discussed with site staff and trade contractors

  • Items discussed with site staff and trade contractors

  • Items discussed with site staff and trade contractors

  • Items discussed with site staff and trade contractors

  • Items discussed with site staff and trade contractors

  • Items discussed with site staff and trade contractors

Site inspection results

  • Housekeeping Status 1. = Excellent 2. = Good 3. = Fair 4. Satisfactory 5. = Unacceptable

  • Trade contractor SWMS Compliance Status 1. Compliant 2. = Non-compliant

  • Toolbox talks meeting Status 1. = Completed 2. = Not completed

  • Testing and Tagging Status 1. = Excellent 2. = Good 3. = Fair 4. Satisfactory 5. = Unacceptable

  • Working at Height Status 1. = Excellent 2. = Good 3. = Fair 4. Satisfactory 5. = Unacceptable

  • Additional comments by attending Manager

  • Inspecting Managers sign off

  • Person consulted sign off

  • Person consulted sign off

  • Person consulted sign off

  • Person consulted sign off

  • Project Manager/Site Manager or Site Supervisor comments

  • Project Manager/Site Manager or Site Supervisor sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.