Title Page
-
Project Name: Morris South
-
Client: LOVELL
-
Date of work commencement
-
Location
-
Checked and prepared by M&A Carpentry Manager
-
Checked and approved By LOVELL Manager
Inspection Checklist
Internal apartment door QA Checklist
-
Are all doors hung as per drawings?
Door Leaf
-
Are all doors damage free?
-
Are the frame to door leaf gaps even and consistent to all doors?
-
Has a 2mm rattle gap been left between door leafs and doorstops to allow for paint?
-
Are all doors aligned with the frame correctly and do not sit proud of the frame when closed?
Door Frame
-
Was the door frame installation carried out as per manufacturers installation guide to all doors?
-
Has the timber doorstop been fitted correctly with sufficient fixings?
Lock and Latch/Flush bolt
-
Does the latch hold the door firmly in place?
-
Does the flush bolt hold door firmly in place for double doors?
Architraves
-
Has the architrave been fixed correctly and mitres sanded flush?
-
Are all architraves free of any protruding nails?
-
Are the walls around architrave damage free?
Door Threshold Gaps
-
Does all bedroom end ensuite doors have 29mm gap between bottom door edge and screed to allow for 21mm carpet build-up and 8-10mm ventilation gap?
-
Does all living room, utility cupboard and any other door in the hallway where vinyl floor is installed to both sides of the door have 15mm gap between bottom door edge and screed to allow for 5mm vinyl build-up and 8-10mm ventilation gap?
-
Does all bathroom doors have 25mm gap between bottom door edge and screed to allow for 15mm tile build-up and 8-10mm ventilation gap?
Skirting / Window Boards
-
Are all joints and mitres free from gaps and tops of junctions level?
-
Where joints in skirting are unavoidable, these joints are mitred, glued and sanded flush?
-
Has adequate fixings been used when fixing skirting?
-
Are all skirting free of any protruding nails?
-
Are the walls above skirting board damage free?
-
Have window boards been installed as per agreed detail?
Manifold Boxing
-
Has the boxing secured and installed as per agreement drawing?
-
Have all sharp edges been sanded?
Photo evidence
-
Photos of the apartment before carpentry 2nd fix works commenced to be provided in this section.
-
Photo evidence covering works noted in above checklist to be provided in this section.