Information

  • Audit Title

  • Conducted on

  • Conducted by

  • Location/Area/Cell

  • Personnel

  • Fence Type:

  • Shift

  • Stope:

Rebar Fence

  • Fence location according to plan.

  • Area inside the fence clean.

  • Leaky Feeder close to stope area.

  • Area inside fence dry enough to avoid pumping.

  • Rebar grid spacing according to specs.

  • Bedspring with fabrene properly.

  • Pouring, breathing & indicator pipes OK.

  • All pipes attached properly inside fence.

  • Each pipe link attached with 3 strands.

  • Fence arch according to the drift span chart.

  • Rebars inserted into 2" holes in the floor & walls.

  • If tight fill. Rebars inserted 2" in the back.

  • First horizontal re bar within 1" of the floor.

  • Rebar joints staggered and overlap 8".

  • Joints secured tightly with rebar ties.

  • If tight fill, Window in the right position.

  • Diamond Drill holes plugged.

  • Is this fence ready to be shotcreted?

  • If No Explain Outcome:

  • Supervisor Signature

Cable Fence

Cable Fence

  • Fence location according to plan.

  • Area inside the fence clean.

  • Leaky Feeder close to stope area.

  • Area inside fence dry enough to avoid pumping.

  • Eye bolt spacing according to specs.

  • Screen and fabrene installed properly.

  • Pouring, breathing & indicator pipes OK.

  • Pour pipe attached properly inside fence.

  • Each pipe link attached with 3 strands.

  • 3/4" forged eye bolts in good condition.

  • Eye bolts installed in back.

  • 1/2" cable in good condition.

  • 1/2" cable properly laced & tensioned.

  • 3 Crosby clamps installed in each dead end of cable.

  • Proper number of 6"x5" posts installed.

  • 4"x4" wire screen overlapped on back, floor & walls.

  • Is this stope ready to be filled?

Muck Fence

Muck Fence

  • Fence location according to plan.

  • Area inside the fence clean.

  • Leaky Feeder close to stope area.

  • Area inside fence dry enough to avoid pumping.

  • Folded welded mesh installed properly.

  • Plateau of pile 8 ft wide.

  • Grade of pile at 45 degrees.

  • Distance from plateau to drift back less than 4 ft.

  • Indicator pipe according to design.

  • I this Fence ready to be shotcreted?

acknowledgements

  • Supervisor Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.