Title Page
-
Document No.
-
Site
- Caval Ridge
- Daunia
- Peak Downs
- Saraji
- Goonyella
- Blackwater
-
Rescue Appliance Callsign
-
Conducted on
-
Crew
-
Shift
BMA Prestart
-
BMA Pre-Start Complete?
BA Checks
-
Complete a full operational check of all BA sets on the appliance.
BA Check
-
Back Plate Number
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
-
Cylinder Number
-
Cylinder Pressure
- <260Bar
- 260Bar
- 270Bar
- 280Bar
- 290Bar
- 300Bar
- 310Bar
- >310Bar
-
SCBA has passed prestart checks, all ancillary equipment is present and functional? Set is fit for on line duties?
Spare Cylinders
-
Enter details of spare cylinders stored on the appliance
Details
-
Cylinder Number
-
Cylinder Pressure
- <260Bar
- 260Bar
- 270Bar
- 280Bar
- 290Bar
- 300Bar
- 310Bar
- >310Bar
Other Checks
-
Defibrillator complete and fully functional?
-
Oxygen Therapy Kit complete and fully functional?<br>
-
Water tank full?
-
Foam tank over 3/4 full?
-
Fire fighting pump oil level full?
-
Secondary pump oil level full?
-
Water produced from delivery?
-
RCR Hydraulic pump fuel and oil levels full?
Comments
-
Insert photographs of any defects
Sign Off
-
Completed By:
Sign Off
-
Signature date