Information

  • Job # / Job Name

  • Conducted on

  • Prepared by

  • Location
  • Document No.

Quality Control Item

Heads and bed joints inspection

  • Head joint size within tolerance? (+- 1/8”)

  • Bed joints size within tolerance? (+- 1/8”)

  • All head joints full?

  • All bed joints full?

  • Less than full joints pointed in?

  • Wire fully in bed joint?

  • Sled runners are being used?

Plumpness of walls inspection

  • Walls within tolerance?

Customer Contact

  • My signature acknowledges that I have walked this job and have found all workmanship to be of professional quality

  • Foreman's Signature & Date

Rebar & grout inspection

  • Dowels in correct spacing within cell?

  • Dowels match reinforcing schedule? Ie., every 4th cell for 32” OC?

  • Rebar positioners are being used?

  • Rebar placed correctly prior to grout?

  • Grout is consolidated?

Untitled Page

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.