Title Page

  • Conducted on

  • Prepared by

  • Location
  • Weather Conditions

  • Client Site

  • Site/ Project Manager

  • Contact details of Site/ Project manager

  • Site Inspection Number

  • Brief Description of the Project

  • Brief description of the works completed on the audit date

  • Have the previous audit items/actions been closed out

1. Site Welfare/ Site Presentation/ Site Preparedness

  • Site Security/ Site Boundary

  • Signing In/ Out Arrangements

  • Welfare Facilities Suitable for the Works

  • Welfare Cleanliness

Site Documentation

  • F10 Notification

  • Construction Phase Plan

  • Is There Environmental Information Available? (Construction Environmental Management Plan, Aspects Register?)

  • Insurance

  • Health and Safety Policy

  • HSE Poster

  • Accident Book

  • Notice/ Communication Board

  • Is there currently clear lines of communication being undertaken (TBTs DABS etc)

  • Induction Process/ Card Checks

  • Statutory inspections completed

  • Permits system currently being conducted correctly

Site Management

  • Hierarchy of Construction Management Present

  • CERTS/Membership/Cards Checked of the Site Management Team

2. Site Emergency Preparedness

  • Fire/ Traffic/ Emergency Planning

  • Are the Construction Activities Planned, Managed, Monitored, and Coordinated?

  • First Aid Facilities

  • First Aider(s) Present

  • Fire Risk Assessment

  • Fire Plan

  • Fire Points Present

  • Emergency Lighting present

  • Emergency Assembly Point

  • Fire Marshall(s)

3. Site Hazards

Site Hazards

  • Risk Assessment & Method Statements

  • COSHH Assessments/ Register

  • Temporary Works

  • Access and Egress

  • Electrical Site Safety

  • Tools/ Equipment (PUWER)

  • Working at Height - Fixed Systems

  • Working at Work - Mobile Systems

  • Excavations/ ground works

  • Lifting operations (LOLER)

  • Mobile Plant/ Traffic Management

  • Asbestos/ Hazardous Substances

  • Demolition Works

  • Confined Spaces

  • Dust/ Noise/ Vibration

  • Manual Handling

  • House keeping

  • PPE/ RPE

  • Other observation/ comments

Environmental Management

  • Environmental management, control of waste, tree protection, recycling, and re-fuelling etc.

  • Are fuel tanks appropriately located? (Non-permeable substrate, on traffic route, appropriate type and size spill kit)

  • Are concrete washouts activities appropriately controlled? (Dedicated washout areas 10+ meters from Drains?)

  • Is there run off from wheel washes and groundworks appropriately controlled? (Are local drains protected, is there a settlement area for excess water?)

  • IS Noise and Dust Adequately Controlled? (has been any nuisance complaints or site observations?)

  • Other observations/ comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.