Title Page

  • Operation Type

  • Conducted on

  • Pilot in Command

  • Co-Pilot

  • Co-Pilot Name

  • Is the Co-Pilot Operating GCS?

  • Location

Flight Conditions

  • Check Wx

  • Windspeed @ Wind Direction

  • Check NOTAM

  • Any local obstructions or interferences?

  • What are the local obstructions or interferences?

  • Check Airspace

  • Airspace Approval

  • Complete and Brief Risk Assesment

  • Confirm that Flight is within Operable Conditions

  • Maintance Release Signed

Airframe Inspection

  • Check the RPA airframe and ensure no cracks or delamination.

  • Check the RPA airframe, checking screws and cables.

  • Check the Camera and Gimble and ensure they are attached and checked.

  • Check that the motors are freely moving.

  • Check that there are no nicks and cracks on the propellers.

  • Check the RPA battery (swelling, and condition)

Batteries

  • Batteries per Flight

  • Amount of Battery Cells

  • Record Voltage per Cell

  • Connect Flight Batteries

Transmitter

  • Voltage of Transmitter Battery

  • Turn Transmitter ON

Navigation

  • Connect C2 Link Telemetry

  • Check GPS Link

  • Create Flight Plan

  • Confirm and Brief Flight Plan

  • Confirm and Brief Flight Profile

Pre-Launch

  • Mission Safe and Go?

  • Proceed to Pre-Launch Checklist

  • Restart Pre-Flight checklist once mission is viable

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.