SECTION 1: LEGALLY REQUIRED DOCUMENTS

  • Copy of OHS Act

  • Construction regulations 2014

  • Copy of client OHS specification

  • OHS plan received and approved and reviewed monthly

  • OHS Plan signed by 16(1) or 16(2)

  • Notification of Construction

SECTION 2: LEGAL ADMINISTRATION

  • OHS policy signed

  • Environmental policy signed

  • Alcohol and drug policy signed

  • Covid-19 policy signed

  • Letter of Goodstanding

  • Medical certificates on file (Annexure 3)

  • ID copies on file

  • Internal Inductions with staff (signed and on file)

  • 37 (2) Mandatory agreement signed and on file

SECTION 3: LEGAL APPOINTMENTS

  • OHS organogram provided

  • Overall authority and accountability 16 (1)

  • Delegation of duties 16 (2)

  • Health and safety representative 17(1) with certificate

  • Health and safety committee member 19 (3)

  • Construction Manager CR 8 (1)

  • Assistant Construction Manager CR 8 (2)

  • Safety Officer CR 8 (5) with certificate and register with SACPCMP

  • Construction supervisor CR 8 (7)

  • Assistant Construction Supervisor CR 8 (8)

  • Risk Assessor CR 9 (1) with certificate

  • Fall Protection Planner CR 10 (1) with certificate

  • Fall arrest equipment inspector CR 10

  • Covid-19 Compliance Officer

  • Temporary Works Designer CR 12 (1) with certificate

  • Temporary Works Supervisor CR 12 (2)

  • Excavation supervisor CR 13 (1)

  • Demolition Work Supervisor CR 14 (1)

  • Scaffold Erector CR 16 with certificate

  • Scaffold Inspector CR 16 with certificate

  • Scaffold Supervisor CR 16

  • Demolition Supervisor CR 14 (1)

  • Rope Access Supervisor CR 18 (1) with certificate

  • Bulk mixing plant supervisor CR 20 (1)

  • Explosive actuated fastening device CR 21

  • Mobile plant operator CR 23 with certificate

  • Portable electrical equipment inspector CR 24

  • Stacking and storage supervisor CR 28

  • Fire equipment inspector CR 29

  • Incident investigator GAR 9 with certificate

  • Hazardous chemical substances inspector

  • Emergency procedure coordinator GSR 3

  • First aider GSR 3 with certificate

  • Ladder inspector GSR 13

  • Machine supervisor GMR 2

  • Lifting equipment inspector DMR 18

  • Tower Crane Operator (With Certificate)

  • Hand tools inspector

SECTION 4: RISK CONTROL

  • Risk assessments drawn, reviewed and communicated

  • Method statements

  • Safe work procedures / SOPs

  • Fall protection plan drawn, reviewed and communicated

  • Material Safety Data Sheets

  • Safety awareness sessions (toolbox talks) weekly

  • DSTI's

SECTION 5: ACCIDENT/INCIDENT PROCEDURE

  • Standard accident procedure

  • Emergency evacuation procedure (communicated and signed)

  • First aid box available

  • First aid dressing register

  • Emergency contact numbers

  • Annexure 1 forms

  • WCL 2 forms

SECTION 6: CHECKLISTS & REGISTERS

  • Hand tools checklist

  • Portable electrical tools checklist (angle grinders, drills etc.)

  • PPE issue and control register

  • Fall arrest equipment checklist

  • Lifting equipment register & checklists

  • Excavation checklists

  • Hazardous chemical substances checklist

  • Ladder register & checklist

  • Temporary Works

  • Stacking and storage / housekeeping checklists

  • First aid box checklist & register

  • Scaffolding checklist & registers

  • Fire extinguisher checklist

  • Explosive powered tools checklist

  • Gas Welding and cutting equipment checklists and inspections

  • Flame or gas cutting equipment

  • Mobile plant

  • Construction Vehicles

SECTION 7: INSPECTION REPORTS / NON-CONFORMANCES/ HANDOVER CERTIFICATES

  • Tower Crane & DB COC

  • Audits Subcontractors

SECTION 8: PHYSICAL STANDARDS AND PROACTIVE SITE MANAGEMENT

Section 8.1: Site Establishment

  • Site Office, lay-down area, and storage

  • Signage: at entrances and as required

  • First Aid Box and Fire Extinguishers

  • Flammable Store

  • Hoarding / Perimeter Fence

  • Are access control measures effective

  • Public Safety requirements

Section 8.2: Non-compliant subcontractors

  • Any concerns relating to subcontractors

Section 8.3: Scaffold structure compliance

  • Has safe vertical access been provided

  • Are platforms effectively boarded

  • Are platforms safe in terms of railings

  • Are scaffold structures tagged

  • Are the tags a true reflection of the structure

  • Are the platforms clean / clear

  • Are the structures level

  • Are sole plates in place

  • Toe Boards in place

  • Are harnesses being used where necessary

Section 8.4: Edge Protection & Excavations

  • Are all edges and openings protected to prevent falls

  • Is material stacked at least 1.5 meters away from exposed edges

  • Are cover-boards secured

  • Protruding rebar / starter bars protection

  • Can excavations be accessed and exited safely

  • Is plant working near workers working in excavations

Section 8.5: Plant & Equipment on site

  • Is Plant and Equipment being used correctly

  • Is the plant and equipment in a good condition (visually)

Section 8.6: Electrical

  • Are the distribution boards in a safe for use condition

  • Are leads being pinched or overstretched

  • Are portable electrical tools and electrical leads in a safe for use

  • condition

Section 8.7: Housekeeping. Stacking & Storage

  • Is material stacked safely

  • Are the walkways clear of tripping hazards

  • Has safe vertical access been provided

  • Are rubble and rubbish being managed effectively

  • Is the flammable store being well managed

Section 8.8: PPE Compliance

  • Hard Hats

  • Reflective bibs or branded clothing

  • Ear Protection

  • Eye Protection

  • Full body Harnesses

  • Footwear (Safety boots)

  • Gloves

  • Respiratory masks

Section 8.9: Planned Task Observations

  • "• Task Observed"

  • "• Is there a safe work procedure?"

  • "• Has the task been performed safely?"

  • "• Does the risk assessment need to be reviewed?"

SECTION 9: PHOTO EVIDENCE AUDIT

  • Photo List:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.