LCA - Cover Page
-
Project Name
-
Audit Reference / Revision No.
-
Conducted on
-
Principal Contractor
-
Principal Contractor Cell
-
Contractors
-
Number of Staff on Site
-
Incidents to report
-
Prepared by
-
Auditor Details : (CHSM/856/2019) - (074 870 3904)
-
Location
SCORE ANALYSIS
SECTION 1: LEGALLY REQUIRED DOCUMENTS
-
Copy of OHS Act
-
Construction regulations 2014
-
Copy of client OHS specification
-
OHS plan received and approved and reviewed monthly
-
OHS Plan signed by 16(1) or 16(2)
-
Notification of Construction
SECTION 2: LEGAL ADMINISTRATION
-
OHS policy signed
-
Environmental policy signed
-
Alcohol and drug policy signed
-
Covid-19 policy signed
-
Letter of Goodstanding
-
Medical certificates on file (Annexure 3)
-
ID copies on file
-
Internal Inductions with staff (signed and on file)
-
37 (2) Mandatory agreement signed and on file
SECTION 3: LEGAL APPOINTMENTS
-
OHS organogram provided
-
Overall authority and accountability 16 (1)
-
Delegation of duties 16 (2)
-
Health and safety representative 17(1) with certificate
-
Health and safety committee member 19 (3)
-
Construction Manager CR 8 (1)
-
Assistant Construction Manager CR 8 (2)
-
Safety Officer CR 8 (5) with certificate and register with SACPCMP
-
Construction supervisor CR 8 (7)
-
Assistant Construction Supervisor CR 8 (8)
-
Risk Assessor CR 9 (1) with certificate
-
Fall Protection Planner CR 10 (1) with certificate
-
Fall arrest equipment inspector CR 10
-
Covid-19 Compliance Officer
-
Temporary Works Designer CR 12 (1) with certificate
-
Temporary Works Supervisor CR 12 (2)
-
Excavation supervisor CR 13 (1)
-
Demolition Work Supervisor CR 14 (1)
-
Scaffold Erector CR 16 with certificate
-
Scaffold Inspector CR 16 with certificate
-
Scaffold Supervisor CR 16
-
Demolition Supervisor CR 14 (1)
-
Rope Access Supervisor CR 18 (1) with certificate
-
Bulk mixing plant supervisor CR 20 (1)
-
Explosive actuated fastening device CR 21
-
Mobile plant operator CR 23 with certificate
-
Portable electrical equipment inspector CR 24
-
Stacking and storage supervisor CR 28
-
Fire equipment inspector CR 29
-
Incident investigator GAR 9 with certificate
-
Hazardous chemical substances inspector
-
Emergency procedure coordinator GSR 3
-
First aider GSR 3 with certificate
-
Ladder inspector GSR 13
-
Machine supervisor GMR 2
-
Lifting equipment inspector DMR 18
-
Tower Crane Operator (With Certificate)
-
Hand tools inspector
SECTION 4: RISK CONTROL
-
Risk assessments drawn, reviewed and communicated
-
Method statements
-
Safe work procedures / SOPs
-
Fall protection plan drawn, reviewed and communicated
-
Material Safety Data Sheets
-
Safety awareness sessions (toolbox talks) weekly
-
DSTI's
SECTION 5: ACCIDENT/INCIDENT PROCEDURE
-
Standard accident procedure
-
Emergency evacuation procedure (communicated and signed)
-
First aid box available
-
First aid dressing register
-
Emergency contact numbers
-
Annexure 1 forms
-
WCL 2 forms
SECTION 6: CHECKLISTS & REGISTERS
-
Hand tools checklist
-
Portable electrical tools checklist (angle grinders, drills etc.)
-
PPE issue and control register
-
Fall arrest equipment checklist
-
Lifting equipment register & checklists
-
Excavation checklists
-
Hazardous chemical substances checklist
-
Ladder register & checklist
-
Temporary Works
-
Stacking and storage / housekeeping checklists
-
First aid box checklist & register
-
Scaffolding checklist & registers
-
Fire extinguisher checklist
-
Explosive powered tools checklist
-
Gas Welding and cutting equipment checklists and inspections
-
Flame or gas cutting equipment
-
Mobile plant
-
Construction Vehicles
SECTION 7: INSPECTION REPORTS / NON-CONFORMANCES/ HANDOVER CERTIFICATES
-
Tower Crane & DB COC
-
Audits Subcontractors
SECTION 8: PHYSICAL STANDARDS AND PROACTIVE SITE MANAGEMENT
Section 8.1: Site Establishment
-
Site Office, lay-down area, and storage
-
Signage: at entrances and as required
-
First Aid Box and Fire Extinguishers
-
Flammable Store
-
Hoarding / Perimeter Fence
-
Are access control measures effective
-
Public Safety requirements
Section 8.2: Non-compliant subcontractors
-
Any concerns relating to subcontractors
Section 8.3: Scaffold structure compliance
-
Has safe vertical access been provided
-
Are platforms effectively boarded
-
Are platforms safe in terms of railings
-
Are scaffold structures tagged
-
Are the tags a true reflection of the structure
-
Are the platforms clean / clear
-
Are the structures level
-
Are sole plates in place
-
Toe Boards in place
-
Are harnesses being used where necessary
Section 8.4: Edge Protection & Excavations
-
Are all edges and openings protected to prevent falls
-
Is material stacked at least 1.5 meters away from exposed edges
-
Are cover-boards secured
-
Protruding rebar / starter bars protection
-
Can excavations be accessed and exited safely
-
Is plant working near workers working in excavations
Section 8.5: Plant & Equipment on site
-
Is Plant and Equipment being used correctly
-
Is the plant and equipment in a good condition (visually)
Section 8.6: Electrical
-
Are the distribution boards in a safe for use condition
-
Are leads being pinched or overstretched
-
Are portable electrical tools and electrical leads in a safe for use
-
condition
Section 8.7: Housekeeping. Stacking & Storage
-
Is material stacked safely
-
Are the walkways clear of tripping hazards
-
Has safe vertical access been provided
-
Are rubble and rubbish being managed effectively
-
Is the flammable store being well managed
Section 8.8: PPE Compliance
-
Hard Hats
-
Reflective bibs or branded clothing
-
Ear Protection
-
Eye Protection
-
Full body Harnesses
-
Footwear (Safety boots)
-
Gloves
-
Respiratory masks
Section 8.9: Planned Task Observations
-
"• Task Observed"
-
"• Is there a safe work procedure?"
-
"• Has the task been performed safely?"
-
"• Does the risk assessment need to be reviewed?"
SECTION 9: PHOTO EVIDENCE AUDIT
-
Photo List: