Product Audit - Pipe Jointing (Fulton Hogan)
-
Document No.
-
Observer
- NJB
- CIT
- GAO
- SHM
- BJP
- LCD
- BSR
-
Conducted on
Chainage
-
General information:
-
Chainage to: Chainage from:
-
Easting
-
Northing
Safety
-
Is there a JSEA on-site?
-
Is minimum on-site safety standards been maintained e.g. (PPE, flashing beacon, reverse parking)
General
-
Confirm jointing operator is suitably qualified
-
If applicable what is the joint number being assessed?
-
Is the joiner maintaining joint records on a daily basis?
-
Add media
Pipe Quality
-
What is the pipe diameter being installed?
- 450mm
- 800mm
- 1000mm
-
Is the PN rating being installed correct for the specified chainage?
-
What should the correct PN rating be?
-
Is pipe quality acceptable
-
Are the pipes clear of damages
-
Is the pipe damage acceptable within the specifications?
-
Add media
Pipe Cleaning
-
Have the ends of the pipes been cleaned?
-
Have all potential surface contaminants been cleaned / wiped off the pipes?
-
Has the inside of pipe been checked for debris / foreign material and removed?
Pipe Alignment and Jointing
-
Has the rubber ring been lubricated and positioned correctly inside the pipe end to create a good seal?
-
Has the next pipe been lifted into the trench safely and correctly?
-
Have the two pipe ends been correctly aligned prior to joining?
-
Using the excavator, have the pipe ends been inserted into one another correctly?
-
Has a quality seal between the pipes been achieved?
-
Are the pipes correctly angled to account for curves in the pipeline alignment?
-
Have the pipes remained undamaged after this joining process?
Visual Inspection
-
Add media
-
Has the joining crew inspected the pipe condition and checked the pipe tolerances prior to joining?
-
Does the completed join appear to be aligned and good quality?
-
Have exposed ends been covered at the end of each shift?
-
Has the join number being stamped and painted with yellow paint?
Notes
Sketches
-
Add drawing
Photos
-
Add media
Sign Off
-
Add signature