3. PAINTING AND DRY FILM COATINGS
-
3.1 Are pre-cleaning and pre-treatment procedures documented on shop paper?
-
3.9 Are materials stored under appropriate temperature environmental controlled conditions?
-
3.10 Is the addition of thinner controlled by viscosity and / or mix ratio, as required by customer / specification / data sheet?
-
3.11 Is the viscosity of the coating material checked and documented prior to use?
-
3.12 Are there procedures for proper agitation and mixing of materials including agitation time, mixing ratios, mixing order and mixing time?
-
3.13 Is mixing time recorded and traceable to the job?
-
Tap to enter information
-
Tap to enter information
-
3.14 Are pot life and induction time recorded and traceable to the job?
4.0 LOT AND PERIODIC TESTING FOR PAINT AND DRY FILM COATINGS
-
4.1 Are thickness test results and methods documented on shop paper?
6. CHEMICAL PROCESS JOB AUDIT OF PAINTING / DRIED FILM LUBRICANTS
-