Title Page
-
Job name and number
-
Conducted on
-
Client
-
Supervisor
-
Prepared by
-
Subcontractor/Employees
-
Work being performed at time on inspection
- installing safety wire
- roof load
- roof lay
- walls
- flashings
- rainwater goods and accessories
- other
- gutters
General
-
Swms onsite and adequate for purpose?
-
Swms signed by all workers and safety plan filed in correctly including writing of their ticket numbers
-
Have any incidents from last week been rectified? What were they?
-
Pre start and toolbox up to date? Done daily
-
Guardrail handover certificate complete?
-
Safety mesh handover complete?
-
Exclusion zones, visual warning and or signage around work area where practicable
-
Photos of exclusion zones, visual warning and or signage around work area where possible.
-
Are materials onsite stacked neatly and bunted to prevent materials being run over or someone injuring themselves.
PPE
-
Hard Hats worn at all times even on roof?
-
Suitable steel cap shoes/boots worn by all workers?<br>Boots only on ground?
-
Gloves suitable for the task being worn?
-
Safety glasses being worn?
-
Hearing protection being worn?
-
Hi Vis being worn by all workers?
Electrical
-
Is the electrical register up to date?
-
All electrical items tagged and in date - must be within 3 month period
-
Works, materials and plant outside electrical exclusion zones - 3m low voltage and 6m for high voltage?
Fall Protection Equipment
-
Is the harness register onsite and in date? (within 6 monthly check period)
-
Check harness tags. Are there harnesses out of date on site? Must be within 6 month check period.
-
Do all workers have a working at heights ticket? (Check the ticket section of the safety plan)
-
Are suitable anchor plates / static lines in use?
-
Is the system suitable for intended use (considering pendulum effect and minimum fall heights)?
-
What rescue equipment is available?
- scissor (basket to fit stretcher)
- boom (basket to fit stretcher)
- scaffold stairs (stretcher stairs)
- gotcha kit
- dog man basket
- access stair
- other
-
Are workers trained in rescue equipment?
Ladders/Trestles/Mobile scaffolds
-
Is an industrial extension ladder is use for access only?
-
3 points of contact at all times on ladders, extended 1m past landing and fixed at top and or bottom?
-
Mobile scaffold is set up as per manufactures instructions (up to 4m high)
-
Suitable for the task?
Roof Access/Edge Protection
-
Industrial ladder secured at top and or bottom, extended 1m past roof (less than 7.5m)
-
Suitable scaffold stairs?
-
Scaffold system is complete - no missing parts, correct rail heights?
-
Guard rail is complete with access point?
-
Workers are not climbing over handrails?
-
Is there a suitable visual barrier in place?
-
Is the access positioned at least 3m from lower voltage power lines?
EWP
-
Only licensed operators are operating the EWP?
-
Log book and safety check is completed daily?
-
Correct PPE worn for EWP and attached to the correct designated position?
-
EWP is being used within the SWL limit?
-
EWP is adequate for the job?
-
Positioned at least 3m from low voltage power lines?
-
EWP exclusion zone, visual warning and or signage around area where reasonably practicable?
-
Photo of EWP work area
House Keeping
-
Are materials on roof and ground secured with strapping?
-
Photo of materials
-
Is cleaning being done progressively?
Incidents/Notes
-
Incidents/notes:
-
Add media
Signature
-
Add drawing