Information
-
FIR Reference Number
-
Radlink Audit Number
-
Conducted on
-
Prepared by
-
Location
-
Kordia Map Number
Survey Data
Survey Data collection
-
Select Survey Type
-
Duct Number
-
FIR Status
-
Duct Location
- Private Property
- Does Not Exist
- Different Start/End Pits
- Duplicated Duct Remove from records
- Significantly different Location
- Newly Discovered Existing Duct
-
Actual Duct Size (if different)
- 10mm
- 20mm
- 25mm
- 30mm
- 35mm
- 40mm
- 50mm
- 60mm
- 65mm
- 70mm
- 80mm
- 90mm
- 100mm
- 120mm
- 150mm
- 200mm
- LIC
- DIRECT BURIED
- EP20MM
- EP32MM
- EP50MM
- EP80MM
- EP100MM
-
Was the Duct Roped
- Yes
- No
- N/A
-
Was the Duct Roped
- Yes
- No
- N/A
-
Actual Measured Length (m) (Roped Length)
-
Maximum Mandrel Head Size (mm)
-
Duct Solution
- Use Alternate Conduit in same nest
- Use Different Route
- Clear Blockage
- Conduit Exposed Requiring work
- Build New Duct
- Mandrel Fails - Cable Fits Approval Required
- Split Cables
- Use existing Telstra duct in place of new build
- Remove Dead Insitu Cable Approval Required
- No Longer Required
-
Construction Method
-
A end blocked distance (m)
-
B end blocked distance (m)
-
Surface Type
- Grass
- Paver
- Gravel
- Bitumen Roadway
- Bitumen Footpath
- Concrete Footpath
- Concrete Driveway
- Other
-
Mandrel Type
-
General Comments
-
Enter reason not inspected
-
Duct Location
-
Actual Duct Size (if different)
- 10mm
- 20mm
- 25mm
- 30mm
- 35mm
- 40mm
- 50mm
- 60mm
- 65mm
- 70mm
- 80mm
- 90mm
- 100mm
- 120mm
- 150mm
- 200mm
- LIC
- DIRECT BURIED
- EP20MM
- EP32MM
- EP50MM
- EP80MM
- EP100MM
-
Was the Duct Roped
- Yes
- No
- N/A
-
Actual Measured Length (m) (Roped Length)
-
Maximum Mandrel Head Size (mm)
-
General Comments
-
FIR Pit Referance Number
-
FIR Status
-
Pit Location
- Private Property
- Does Not Exist
- Different Start/End Pits
- Duplicated Duct Remove from records
- Significantly different Location
- Newly Discovered Existing Duct
-
Actual Pit Size (if different)
- Pit O, H (Hand Moulded)
- Pit 1, H (Hand Moulded)
- Pit 2, H (Hand Moulded)
- Pit 3, H (Hand Moulded)
- Pit 4, H (Hand Moulded)
- Pit 5, H (Hand Moulded)
- Pit 6, H (Hand Moulded)
- Pit 7, H (Hand Moulded)
- Pit 8, H (Hand Moulded)
- Pit A, H (Hand Moulded)
- Pit B, H (Hand Moulded)
- Pit C, H (Hand Moulded)
- Pit D, H (Hand Moulded)
- Pit D, H (Hand Moulded)
- Pit 1, J (Injection Moulded)
- Pit 2, J (Injection Moulded)
- Pit 3, J (Injection Moulded)
- Pit 4, J (Injection Moulded)
- Pit 5, J (Injection Moulded)
- Pit 6, J (Injection Moulded)
- Pit 7, J (Injection Moulded)
- Pit 8, J (Injection Moulded)
- Pit 9, J (Injection Moulded)
- Pit 1, P (Thermoplastic)
- Pit 2, P (Thermoplastic)
- Pit 3, P (Thermoplastic)
- Pit 4, P (Thermoplastic)
- Pit 5, P (Thermoplastic)
- Pit 6, P (Thermoplastic)
- Pit 7, P (Thermoplastic)
- Pit 8, P (Thermoplastic)
- Pit 9, P (Thermoplastic)
- Pit 6, PC (Precast)
- Pit 8, PC (Precast)
- Pit 9, PC (Precast)
- Manhole, 1 lids
- Manhole, 2 lids
- Manhole, 4 lids
- Manhole, 6 lids
- Pit E2, P(Electrical Thermoplastic)
- Pit E5, P(Electrical Thermoplastic)
- Pit E6, P(Electrical Thermoplastic)
- Pit E8, P(Electrical Thermoplastic)
- Pit E9, P(Electrical Thermoplastic)
- Other
-
Damage Requiring Repair
-
Reason for device relocation
- Use Alternate Conduit in same nest
- Use Different Route
- Clear Blockage
- Conduit Exposed Requiring work
- Build New Duct
- Mandrel Fails - Cable Fits Approval Required
- Split Cables
- Use existing Telstra duct in place of new build
- Remove Dead Insitu Cable Approval Required
- No Longer Required
-
Remediation Required
- No Longer Required
- Upgrade to 5 pit
- Upgrade to 6 pit
- Upgrade to 8 pit
- Upgrade to 9 pit
- Replace pit like for like
- Replace lids
- Raise pit
- Lower pit
- Replace collar
- Raise pit and replace lids
- Lower pit and replace lids
- Replace collar & replace lids
- Raise pit and replace collar
- Lower pit and replace collar
- Repair
- Pillar Extension
- Pillar Replacement 900
- Pillar Replacement 1800
- Pillar Recovery
- New 900 Type Pillar
- New 1800 Type Pillar
- Other
-
Reason for Remidiation
-
Surface Type
- Grass
- Paver
- Gravel
- Bitumen Roadway
- Bitumen Footpath
- Concrete Footpath
- Concrete Driveway
- Other
-
General Comments
-
Enter reason not inspected
-
General Comments
Photo's
-
Photo's of Pit or Duct
-
Take Photo of the Duct A end in the Pit
-
Take Photo of the Rope Tag at Duct A end
-
Take Photo of the Duct B end in the Pit
-
Take Photo of the Rope Tag at Duct B end
-
Take Photo looking along the duct if roping not successful ( From A and B end )
-
Take Photo the Pit from the road verge
-
Take Photo inside of Pit
-
Take Photo of conduit entry on Left hand-side (Manholes only) (Pit - only need separate photo if ducts not clear inside pit photo)
-
Take Photo of conduit entry on Right hand-side (Manholes only) (Pit - only need separate photo if ducts not clear inside pit photo)
Help