Information

  • Conducted on

  • Location
  • Property Address / Job Name

  • Crew / Subcontractor-Crew

  • Quality Inspection Prepared by

QUALITY INSPECTION

  • Is job site clean and clear of roofing materials?

  • Are there six nails per shingle?

  • Are there exposed nails?

  • Are rake edges cut properly?

  • Are the valleys dove cut and bulled properly?

  • Are kick outs installed properly?

  • Is roof cement on all metal flashing?

  • Is peel and stick installed properly where fascia ends at a wall?

  • Are plumbing boots installed correctly?

  • Is all attic ventilation installed correctly?

  • Has the dryer vent screen been removed?

  • Are ridge caps installed correctly?

  • Are shingles installed to manufactures specifications?

  • Are all areas of the shingle installation 100% complete?

  • Are there any additional roofing systems to be installed? If yes, document below.

  • Other roofing system info if applicable:

  • Superintendent's Comments:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.