Title Page

  • PM Name

  • Telephone Number

  • Store Name

  • Store Number

  • Store Manager

  • Store Address
  • Email

  • Date

  • INSTRUCTIONS
    _______________

    1. Please answer all the questions below.
    2. To add a Corrective Measure click on the Paperclip icon then ""Add Action"", provide a description, assign to a member, set priority, and due date
    3. Complete audit by providing digital signature
    4. Share your report by exporting as PDF, Word, Excel or Web Link.

Store Details

  • Store Trading Hours

Key Dates

  • Pre Start Meeting Date & Time

  • • Day

  • Night 0 1st Fix Data/Power Cables Date & Time

  • Main Installation Stage 1

  • Main Installation Stage 2

  • Main Installation Stage 3

  • Main Installation Stage 4

  • Main Installation Stage 5

  • Handover/Training Start Time/Day/Date

  • Go Live

Version Control and Change Log

  • Click "Add Item"

  • Item
  • Version

  • Brief Description of Changes

  • Date

Pre-Start Meeting Attendance

  • Click "Add Attendee"

  • Attendee
  • Store Management Team

  • Representative

  • Contact Details

Contractors Selected For Install

  • Click "Add Contractors"

  • Contractors
  • Discipline

  • Company

  • Contact Name

  • Contact Number

Required Night 1

  • SCO Equipment : NCR

  • Install/Removal : ATL

1.00 Items to be Checked Out

  • 1.01 Check all working to same approved drawing and verify on site survey any anomalies

  • What schedule version is the survey based on?

  • Dwg No

1.02 : Look outs that may obstruct install

  • Lighting, Sprinklers, Smoke Detectors, Air Con

  • Grilles, Columns, Bulkheads, CCTV, AOIF Cameras

  • Alarm System, Refrigeration, Walls or Partitions

  • Any other items found

1.03 : Cash System/Service Poles/Floor Channel

  • Cash System

  • Is the cash system working to the Main Bank

  • No visible damage to stations

  • Is the cash system currently operational

  • No other cash system issues in store

1.04 : Checkouts and Furniture

  • Mainbank Type

  • Do the Mainbank numbers match the issued drawing

  • • Please state numbers of checkouts to be removed

  • No. of Mainbank checkouts to De-install

  • No. of Mainbank checkouts to install or resite

  • Which Main Bank Till have the Hearing aid loops fitted

  • Comms Cabinet Take a high def picture of

  • Mainbank Checks
  • Main bank Number

  • Is the hand scanner present

  • Is the hand scanner working

  • Does the main bank have a hand scanner stand on it

  • Is the scanner scale present

  • Is the scanner scale working

  • Does the scanner scale have a stalk scanning thing at the back of it

  • Is the PED present

  • Is the PED working (Welcome to Morrisons on screen)

  • Is the Catalina Present

  • Is the Catalina printer working

1.04a : SCO Equipment

  • No of LH 1 Bag R6 Self Scan Checkouts to Install

  • No of RH 1 Bag R6 Self Scan Checkouts to Install

  • No of LH 2 Bag R6 Self Scan Checkouts to Install

  • No of RH 2 Bag R6 Self Scan Checkouts to Install

  • No of LH 3 bag R6 Self Scan Checkouts to install

  • No of RH 3 bag R6 Self Scan Checkouts to install

  • No of LH or RH Self Scan Checkouts to Remove

  • No of LH 1 Bag V5 Self Scan Checkouts to Resite

  • No of RH 1 Bag V5 Self Scan Checkouts to Resite

  • No of LH 2 Bag V5 Self Scan Checkouts to Resite

  • No of RH 2 Bag V5 Self Scan Checkouts to Resite

  • No of RH 3 Bag V5 Self Scan Checkouts to Resite

  • No of LH 3 Bag V5 Self Scan Checkouts to Resite

  • No of R6 Narrow Self Scan Checkouts to install

  • No of lengths of Floor Trunking Required

  • • Size

  • • Qty

  • Additional Different Lengths of Trunking

  • • Size

  • • Qty

  • Lanes that have the 8 port switches in the bagwell section

  • If present which ports are spare?

  • No. of Coupon Bins to Install

  • No. of Coupon Bins to Relocate

  • Do the existing SCO have Welsh Branding

  • Where is the 1st Express checkout after the Self scan – is it next to the self scan checkouts

  • Install New/Resite Existing Detagger for Coupon Bin

1.05 : Ceilings/Bulkheads

  • Is there a ceiling above the proposed installed?

  • • What type of ceiling/size (clip in, metal pan, drop in)?

  • • Size

  • What is the ceiling height

  • Are there any different additional tiles required?

  • No of new ceiling tiles required

  • Any new ceiling grid required?

  • Will the ceiling above take a magnetic holder?

  • Is the store flagged for ceiling issues on schedule?

  • Is there a bulkhead above the proposed install?

  • • What type of bulkhead/size (clip in, metal pan, drop in)?

  • • Size

  • Are there varying levels affecting service poles install?

  • No of new 63mm Service poles to be installed

  • No of 75mm Service poles to be removed

  • Any other ceiling or bulkhead issues?

1.06 : Flooring Works

  • Is there a floor trench? <br>

  • If removing Mainbank checkouts are there any Floor Tiles missing underneath the Mainbank checkouts

Describe Floor Tile and take photo beside white paper

  • Tile type 1

  • • Colour

  • • Chip

  • • Size

  • Tile type 2

  • • Colour

  • • Chip

  • • Size

  • Max No of new Floor Tiles required under Mainbank checkouts

  • • Type 1

  • • Type 2

  • Max No of new Floor Tiles required under Mainbank checkouts

  • • Type 1

  • • Type 2

  • Is store No between 170 and 400?

  • Does store have under floor heating?

  • Any other flooring issues?

1.07 : Signage

  • Signage positions and type

  • Any dual language signage required?

  • Any other signage issues?

1.09 : Builders Works

  • Safety barriers and Site Board responsibility

  • Any other works?

  • Please specify.

1.10 : AOIF

  • Any AOIF Cameras to be Switched off?

  • Any AOIF Cameras to be Resited?

  • Any other AOIF Issues?

  • Please specify.

1.11 : Scales

  • Mainbank to be verified/calibrated and till numbers

  • Any Scales to be resited?

  • Any Scales to be removed from site?

  • Any other scales issues?

1.12 : IT Till Works

  • Any new Till IT Equipment to be installed?

  • Any existing Till IT Equipment to be resited?

  • Any Tills need renumbering?

  • Any Till IT Equipment to be removed from site?

  • No of Catalina Printers to be relocated

  • No of Catalina Printers that require renumbering

  • No of Additional Catalina Printers required

  • Any other issues?

1.13 : Electrical and Data

  • Requirements for under, over and floor channel feeds

  • Number and location of data terminals required

  • Any new switches required to be placed on order

  • Will there be any builders works involved

  • Any power/data surface Floor channels to resite

  • Any power/data surface Floor channels to install

  • Any other data or power issues

1.14 : Access Equipment

  • Access Equipment Required

  • NCR to provide access equipment

  • Safe working load of dock leveler.

  • Dropping off and storage of access equipment

  • Any other equipment issues?

  • Picture of dock leveller required

  • Delivery details from or rear of the store and are the any restrictions

1.15 : Store Communication

  • Are the any technology issues in the store

  • Ensure that the store has been told to log all faults recorded

Completion

  • Completed By : (Name & Signature)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.