Information
-
Engineer Name
-
Customer
-
Store Name
-
Store Number
-
Conducted on
-
Scope of Work
-
Proceed to next section >
Prerequisite Tasks
SCO Check
-
Is there damage to any of the cables
-
State which SCO number(s)
-
Take clear pictures of damaged cable(s)
-
Proceed to next section >
New Parts Installed - Normal SCO
-
Click "ADD SCO" to record details and tests carried out:
-
You will record the details of the belted SCO on the next page
Normal SCO
-
Lane number of SCO
Before Photographs
-
Take a clear picture of the trunking
-
Take a clear picture of the wiring and earth bonding
-
Take a clear photo of each existing brackets installed (4 x photos all together)
Completed Work Photographs
-
Take a picture of the wiring and earth bonding
-
Take a clear picture of the newly installed conduit
-
Take a clear picture of each new installed L brackets installed (4 x photos all together)
-
Take a picture of the SCO welcome screen
New Parts Installed - Belted SCO
- Normal SCO
-
Lane number of Belted SCO
Before Photographs
-
Take a clear picture of the trunking
-
Take a clear picture of the wiring and earth bonding
-
Take a clear photo of each existing brackets installed (2 x photos all together)
Completed Work Photographs
-
Take a picture of the wiring and earth bonding
-
Take a clear picture of the newly installed conduit
-
Take a clear picture of each new installed L brackets installed (2 x photos all together)
-
Take a picture of the SCO welcome screen
Site Sign Off
Engineer Sign Off
-
By ticking the box, the Engineer is confirming that all work and tests were completed as per NCR and Customer Requirements
-
Please enter any additional comments or notes here
Customer Sign Off
-
By ticking the box, you are confirming that all work has been completed successfully and too satisfaction per individual SCO
-
Store Representative Position
-
Store Representative Name & Signature