Title Page
Engineer Details
-
Lead Install Engineer
-
If Second Engineer present on install please add Name
-
Second Engineer
-
Engineer Name
-
Training Shift
-
Document No.
Site Details
-
Store Name
-
Store ID
-
Address
-
Conducted on
Site Contacts
-
Site Manager
-
Tel No.
Job Type
-
-
Proceed to Next Section (Pre Start Checks) >
Pre-Start Checks
Site Safety Sign Off
-
Health & Safety sign off to be completed prior to starting any works.
-
All NCR Engineers Signed into Store Visitor Log & Equipped with appropriate PPE?
-
Can works be carried out?
-
You must not carry out any work until you have appropriate PPE
-
Risk Assessment & Method Statement Read, Agreed & Signed by all?
-
Can works be carried out?
Site Checks
-
Store Plans/Drawings/Scope Of Works Checked?
-
Proceed to Next Section (Site Testing) >
Site Testing
Pre-Upgrade Site Tests:
-
All tests must be carried out on all devices prior to store sign off. Please provide as much detail as possible (where necessary)
Back Office
-
Are tills connected to BOH?
Photo Attachment
-
Attach Photo
Test Fail
-
Please provide details of failure
Photo Attachment
-
Attach a photo if required
-
Attach Photo
Till Tests
-
You must carry out a test on each till, to add the detail click on Add Till
Till
-
Carry out all tests on all tills
Bio Reader & MSR Reader Test
-
Carry out a visual check to ensure the device is powered up
-
Are all Bio Readers / Mag Stripe Readers working?
Test Fail
-
Please provide details of failure
-
Carry out a single transaction on each till
Photo Attachment
-
Attach Photo
Transaction Tests
-
Carry out a transaction(s) to test the following till functionalities
-
Has the till drawer fired?
Test Fail
-
Please provide details of failure
Photo Attachment
-
Attach a photo if required
-
Attach Photo
-
Has a receipt printed?
-
Does the receipt have a logo?
Photo Attachment
-
Attach Photo
Test Fail
-
Please provide details of failure
Photo Attachment
-
Attach Photo
Test Fail
-
Please provide details of failure
Photo Attachment
-
Attach a photo if required
-
Attach Photo
EFT Test
-
Carry out a transaction and ring up via EFT
-
Did the sale go through the PED/PDQ device?
Test Fail
-
Please provide details of failure
Photo Attachment
-
Attach Photo
Refund Test
-
Carry out a refund on a till to test its functionality
-
Did the refund go through?
Test Fail
-
Please provide details of failure
Photo Attachment
-
Attach a photo if required
-
Attach Photo
Kitchen Screen Tests
-
Ring through an order(s) through a till
-
Does the order route to the correct screen?
Test Fail
-
Please provide details of failure
Photo Attachment
-
Attach a photo if required
-
Attach Photo
-
Are Orders printed on remote printer?
Test Fail
-
Please provide details of failure
Photo Attachment
-
Attach a photo if required
-
Attach Photo
Bump Bar Tests
-
Does the bump bar bump the order?
Test Fail
-
Please provide details of failure
Photo Attachment
-
Attach a photo if required
-
Attach Photo
-
Proceed to Next Section (Store Sign Off) >
Store Sign Off
Store Sign Off
Lead Engineer Sign Off
-
Is this store 15.1 upgrade ready?
-
By ticking the box, the Lead Install Engineer is confirming that all work and tests were completed as per NCR and Customer Requirements
-
Lead Engineer Signature
-
Date/Time of Completion?
-
Add media
Customer Sign Off
-
Please enter any additional comments or notes here
-
The installation was successfully completed and all items either work properly or have an acceptable plan to rectify any issues satisfactorily
-
Store Representative Name & Signature
-
Store Representative Position
-
Miscellaneous