Information

  • Site Address

  • Conducted on

  • Contract Number

  • Piling Rig

  • Personnel/Site Operatives

  • Prepared By

A) Welfare, Access and Site Set Up

  • 1. Are suitable Welfare facilities provided?

  • 2. Is water available on site?

  • 3. Is there safe electric to use?

  • 4. Is a safe means of access/egress provided?

  • 5. Is the working area firm, level & suitable?

  • 6. Are working areas free of obstruction?

  • 7. Is the working area tidy (Housekeeping)?

  • 8. Are vehicles & pedestrians segregated?

B) Job Specific Checks

  • 1. Does the Foreman have copies of up-to-date and relevant drawings?

  • 2. Has the Foreman arranged for the necessary materials to complete the project?

  • 3. Is the piling area clear of any overhead cables/obstructions?

  • 4. Has the NFS Permit To Dig (PTD) been signed?

  • 4a. Are any other permits required?

  • 5. Is the piling mat level correct and agreed?

  • 6. Have levels been agreed and identified on site? Do our Operatives know?

  • 7. Does Steel need to be left at a certain height?

  • 8. Do piles need to be built up?

  • 9. What is the Setting Out status?

  • 10. Is integrity testing required?

  • 11. Building Inspector status

  • 12. Are we completing spoil away?

  • 13. Have pallets been returned?

C) Storage and Movement of Materials

  • 1. Are compress gases stored/secured correctly?

  • 2. Drip Trays/Protection/Spill Kits?

  • 3. Is hard standing available for pile reinforcement storage?

D) Health & Safety

  • 1. Are all operative wearing as a minimum hard hat, hi viz and safety boots?

  • 2. Are there any site specific PPE requirement? Are NFS operatives being compliant?

  • 3. Accident book - any unrecorded items?

  • 4. First aid kit available, and does it include an eye wash station?

  • 5. Fire Extinguisher available and in working order?

  • 6. Foreman's Health & Safety Pack in order?

E) Paperwork

  • 1. Daily / Weekly Plant Inspection Checklist completed?

  • 2. Piling mat certificate completed and available?

  • 3. Toolbox Talks completed and signed?

  • 4. Delivery Tickets returned to office?

  • 5. Have the pile logs been signed and returned?

  • 6. Have Method Statements been signed by NFS/Steel fixer?

  • 7. Any new RAMS required?

F) Equipment

  • 1. Does the foreman have all the necessary rig ancillary equipment : Pins, Dip tape, Torch, wheel barrow, hammer, shovel, tying wire, steel cutters, line spray, boat level, bucket.

  • 2. Safety harness, lanyards, links and karabiners available and in order?

  • 3. Do we have any hired plant on site?

  • 4. Is plant clean and maintained?

  • 5. Do we have enough fuel for the items of plant on site?

  • 6. Is the plant in good working order?

  • 7. Has any plant been damaged?

  • 8. Any maintenance related issues?

  • The issue

  • Add media

G) Anything Else

  • Comments:

  • Any comments as a result of the audit by either the Foreman or Contracts Manager?

  • site visit photos

  • Auditor:

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.