Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Store Communications
-
Is the manager aware of what works are happening and when?<br>
-
Have you got and tested the alarm code?
-
Have you got and tested the key?<br>
-
Have you received the manager contact number for emergencies?
-
Does the manager have your contact number?
Site Set Up
-
Is the site file on site
-
Does the site file include all required information?<br>- Programme<br>- Scope<br>- Drawings<br>- RAMS<br>- Asbestos Report<br>- Manufacture Drawings (if applicable)<br>- Task List<br>- CDM Construction Phase Plan
-
Are 12nr 'Refurb Whilst Trading' signs up and set at around 1.5m High with two in windows?
-
Are the windows covered to the shop front?
-
Are construction signs (no entry) on the entrances where the public may access the site?
-
Site office set up?<br>- Site file<br>- Register<br>- Fire Evacuation Notice<br>- Emergency Station
-
Emergency Station:<br><br>Is it fully functioning?<br>Bell working?<br>Sand bucket full?<br>
-
Is the coffee machine protected?
-
Are the fridges wrapped?
-
Are all materials stored correctly?
-
Is the public segregated from the work adequately?
Completion
-
Has walk around been completed?
-
Has audit been carried out against scope?<br><br>- Photos<br>- Comments<br><br>Site Audit Report
-
Has the quality been checked on all elements?<br>
-
Has scope been ticked off and sent to the client?
-
Snagging and Remaining Works - has the list been sent to the PM?
-
Has the furniture layout been checked off against plan?<br>
-
Have keys been returned to store manager?
-
Specific Checks
-
Coffee machine back and tested?
-
Appliances back and tested?
-
Veneer to bar colour match correct?
-
Veneer to bar no blue showing?
-
Kick plates all on customer facing door faces and correct size and fit?
-
All wall graphics up internal as per design?
-
Keyline applied in window and free from halo or bubbles?
-
Internal black signage correct and all present?
-
Decoration checked for snags?
-
Toilets seats secure?
-
Toilet flush working correctly and tested?
-
Lose furniture laid out as per design?
-
Banquette installed and secure?
-
Bar joinery (Ops Easing) items fitted as per scope?
-
Mat well cut correctly, level with tight mitres?
-
Floor, flush with no lipping or chipped tiles?
-
Iron mongery to wc working?
-
Electrics as per design?