Information
-
Document No.
-
Audit Title
- HV Site Inspection 11kv -132kv
- LV Site Inspection
- Cable Laying Site Inspection
- YARD AUDIT
- FITTING GENERATORS
-
Client / DNO
- SSE South
- SSE North
- WPD
- NIE
- SPEN
-
Conducted on
-
Prepared by
-
Location
-
Personnel
- Nettworx Direct staff
- Hv - Lv jointers
- Tree Cutters
- Traffic Contro
-
Date:
-
Vehicle Registration:
- R1NWX
- R2NWX
- R4NWX
- R5NWX
- R7NWX
- R8NWX
- R10NWX
- R11NWX
- T1NWX
- T2NWX
- T3NWX
- T4NWX
- T5NWX
- T6NWX
- T7NWX
- T10NWX
- T11NWX
- S1NWX
- S4NWX
- S6NWX
- S7NWX
- S8NWX
- S9NWX
- NWX38 (Mini Digger)
- NWX43
- NWX44
- NWX45
- NWX06 (7t Digger)
- 4CX (Raymond)
- 4CX (Bob)
- CGZ2309
- DP69 UXO
- R9NWX
- Other
-
Other Registration
-
Contract:
- SSE South
- SSE North
- WPD
- NIE
- SPEN
-
Location:
-
Work in progress:
- HV Site Inspection 11kv -132kv
- LV Site Inspection
- Cable Laying Site Inspection
- YARD AUDIT
- FITTING GENERATORS
-
Contract Manager:
- Richard Edgar
- Niall Mcaleer
- Declan Hamill
- Marcus Munnelly
- Ross Taylor
-
Auditor
- Conor Lavery
- Sean Laverty
- Declan Hamill
- Dominic Bostock
- Richard Edgar
- Brian McKeown
Nettworx staff
-
undefined
- Sean Laverty
- Conor Lavery
- Ciaran Beagon
- Andrew Robinson
- James Moore
- Ben Swinbourne
- Isaac Francis
- Josh Keddie
- William Edgar
- Conal Murray
- Joe Moynihan
- Ryan Shaw
- Russelle Ty
- Billy Shaw
- Carlos Botelho
- Johnny Haywood
- Billy Ridgwell
- Aaron Hamilton
- Chris Morrison
- Alex Gibbs
- Gareth Rees
- Adam Sinclaire
- Simon Fletcher
- John Gilbertson
- Ryan Williamson
- David Rees
- Gary Davies
- Robert Floyd
- Raymond Wilson
- Nick Petley
1.0 Site Observations
-
1.1 Safe Access/Egress to work site?
-
1.2 Appropriate warning signs posted?
-
1.3 Vehicles clean and tidy?
-
1.4 Is vehicle secure / ignition keys removed / parked safely?
-
1.5 Signing and guarding correct? ( NRSWA)
-
1.6 Pedestrian / Public safety satisfactory?
-
1.7 Is livestock protected?
-
1.8 Housekeeping - Safe and tidy site?
-
1.9 Are all site operatives Nettworx induction and have a valid Nettworx ID card?
2.0 Documentation
-
2.1 Individual ID / Authorisation / DNO Rules Card on site and Available?
-
2.2 Team Leader Pack Complete?
-
2.3 Site specific Risk Assessment sufficient and all team briefed, aware of controls and signed onto the Risk Assessment?
-
2.4 Utility Plans available, legible and current?
-
2.5 Are all Training Certificates i.e. MEWP, Plant, Chain saw, Strimach etc. Cards on site in date?
-
2.6 Distribution Safety Rules, Operational Practice Manual Authorisations, ID cards Available and in date?
-
2.7 Relevant Safety Alerts, Tools Box Talks Received and Understood?
-
2.8 Are safety docs PTW, LWC, LOA work instructions adequate and understood?
-
2.9 Is the HSG47 Check Sheet completed?
3.0 Plant, Tools & Equipment
-
3.1 CAT Present?
-
CAT Number:
-
Next Calibration Due:
-
3.1.1 Genny Present?
-
Genny Number:
-
Next Calibration Due:
-
3.2 Megger, Earth Loop, Volt Meter Test Lamps, Proving Unit, Rotoscope, KP Tester, Portable Earths HV, LV in date and stored safely in a dry bag. (HV test set if in use)
-
3.3 Lifting Equipment (chains, shackles, slings, winch) in good order and within calibration? Loler colour tag fitted?
-
3.4 Excavator in good working order and fit for purpose? Weekly defect sheet filled out?
-
3.5 Vehicles, plant & machinery in good working order, with daily inspections completed?
-
3.6 Trailer in good order - lights, number plate, break away cable etc?
-
3.7 Wheel nut indicators on all vehicles?
-
3.8 MEWP / Strimach (other) / LOLER in date?
-
3.9 Are general and insulated hand tools in good condition no significant damage?
-
3.10 Are insulated rods in good condition and in date?
-
3.11 Ladders tested, tagged, in date? Rungs, stiles,hooks, guides in good condition?
-
3.12 Have all staff been trained in all tools & working techniques?
4.0 Electrical Safety
-
4.1 Permit, Lwc, Oral instructions understood and communicated with everyone on site?
-
4.2 Earths installed correctly?
-
4.3 Work taking place in clear site of applied Earth?
-
4.4 Earths in date?
-
4.5 LV arrangements-Earthing, phase rotation/polarity test, voltage, earth loop all recorded for reference?
-
4.6 Safe system of work as method statement?
-
4.7 Has a Full CAT & Genny Survey been conducted & trial holes excavated? Services marked?
5.0 Welfare
-
5.1 Provision for obtaining Hot Water?
-
5.2 Suitable arrangements for toilets?
-
5.3 Suitable facilities for washing available?
-
5.4 Soap and towels / wipes available?
6.0 Personal Protective Equipment
-
6.1 5 points of Nettworx PPE being worn and kept in good condition?
-
6.2 Hi-Viz wet gear available, stored correctly and worn as required?
-
6.3 LV / HV PPE being worn as required?
-
6.4 Insulated work gloves (Class 0 / 1) in date?
-
6.5 Insulated work gloves tested (blow up test)?
-
6.6 Insulated gloves stored correctly?
-
6.7 Full face visor available and worn when required?
-
6.8 Hearing/Eye/Head/Dust Masks/Hand/Safety Footwear available and worn if required?
-
6.9 Climbing equipment in good condition and worn as required?
-
6.10 Ariel rescue kit unopened and available at work site?
-
6.11 Is all PPE being correctly stored?
7.0 Environment
-
7.1 Are appropriate sized spill kits readily available?
-
7.2 Is waste correctly separated for disposal?
-
7.3 All containers correctly labelled?
-
7.4 Hazardous materials stored correctly?
-
7.5 Are all containers fit for purpose?
-
7.6 Is COSHH information available on iPad or Hard copy, understood and complied with?
8.0 Work Practice
-
8.1 MEWP / Lorry Loader stabilisers and spreaders pads in use?
-
8.2 Harness and fall restraint worn if working in MEWP?
-
8.3 Shrouding applied and live working procedures followed?
-
8.4 Earth, Locks, Notices applied?
-
8.5 No persons working below person working at height?
-
8.6 No persons working under a suspended load?
-
8.7 No persons climbing above an excavator working below?
-
8.8 Plant, equipment, materials and vehicles arranged safely to protect staff & public?
-
8.9 Are exclusion zones set up and being maintained where practical?
-
8.10 Are first aid kits and eye wash available and in date?
-
8.11 Are burns kits available and in date?
-
8.12 Fire Extinguisher present and in date?
-
Calibration due date:
Footer
-
Comments and Actions required:
-
Image of site.
-
FML / Auditor
- Conor Lavery
- Sean Laverty
- Declan Hamill
- Dominic Bostock
- Richard Edgar
- Brian McKeown
-
Add signature
-
Team Leader
- Sean Laverty
- Conor Lavery
- Ciaran Beagon
- Andrew Robinson
- James Moore
- Ben Swinbourne
- Isaac Francis
- Josh Keddie
- William Edgar
- Conal Murray
- Joe Moynihan
- Ryan Shaw
- Russelle Ty
- Billy Shaw
- Carlos Botelho
- Johnny Haywood
- Billy Ridgwell
- Aaron Hamilton
- Chris Morrison
- Alex Gibbs
- Gareth Rees
- Adam Sinclaire
- Simon Fletcher
- John Gilbertson
- Ryan Williamson
- David Rees
- Gary Davies
- Robert Floyd
- Raymond Wilson
- Nick Petley
-
Add signature
-
Actions Completed / Closed Off?