Title Page
-
Site
-
Site Diary Ref No:
-
NR ASPRO Representative
-
Network Rail ASPRO construction manager
-
NR APSIM
-
Project/ Remit Number:
-
Outside Party or Third Party Site Representative
-
Date and Time of site Attendance
-
Location
-
What3Words location
-
Weather Conditions:
-
ELR / Mileage
-
Brief Description of Works:
-
Plant & Equipment in Use:
-
TBS / WPP or Method statement Ref:
Track access arrangements and details
-
Track Access details and timings
-
WON Item No
-
Access Type
- RailHub Line blockage
- Line Blockage
- Line Blockage & Detonator Protection
- Line Blockage and EPR
- Line Blockage and Disconnection
- Line Blockage and Token
- Line blockage and TCOD
- Possession
- Sidings Possession
-
Stand Alone or Signing in with others
- Stand Alone Access
- Signing in with Protection Controller (PC)
- Signing others in acting as Protection Controller (PC)
- Acting as Engineering Supervisor (E/S)
- Signing in with Engineering Supervisor
-
Time Access planned to be taken
-
Time Access Actually Taken
-
Time Signed in With E/S or PC
-
Reason for any Delay to access being taken
-
Time Access Planned to be Cancelled
-
Time Signed out with E/S or PC
-
Time Access Actually Cancelled
-
Reason for any Early Cancellation (for Example Signaller asked for earlier handback PC and or E/S asked for early handback, Client Finished early etc.)
Isolation Details and Timings
-
Isolation Required
-
Type of Isolation
-
Isolation Supplied by
-
Time Isolation Taken
-
Time Form C (Permit to Work Issued by Nom) and any reason for delay
-
Any reason for any delay to taking of Isolation
-
Time Isolation requested to be Cancelled by nominated Person
-
Time Form C (Permit to Work Cancelled) and any reason for early return
-
Time Isolation Cancelled
Site Report Details
Hourly Reporting Entry
-
Observation 1
-
Observation 2
-
Observation 3
-
Observation 4
-
Observation 5
-
Observation 6
-
Observation 7
-
Observation 8
-
Observation 9
-
Observation 10
-
Observation 11
-
Observation 12
-
Additional Observations 13-30 if required
-
Observation 13
-
Observation 14
-
Observation 15
-
Observation 16
-
Observation 17
-
Observation 18
-
Observation 19
-
Observation 20
-
Observation 21
-
Observation 22
-
Observation 23
-
Observation 24
-
Observation 25
-
Observation 26
-
Observation 27
-
Observation 28
-
Observation 29
-
Observation 30
-
Additional Observations List Below
-
PGI carried out
-
1. General Documentation
-
1.2 Accident records available and on site
-
1.3 Construction H & S Plan approved & on site
-
1.4 Work Package Plan/Task Briefing/Method Statements (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)
-
1.5 Risk Assessments (PPE, COSHH)
-
1.6 Access Permits
-
1.7 F10 Form, HASAWA Notice, H&S Policy, First Aid
-
1.8 Contractors Safety Inspections
-
1.9 Statutory Inspections (Lifting equipment, scaffolding etc.)
-
1.10 Briefing Records (Site Induction, Tool Box Talks)
-
1.11 Insurance Certificate displayed & in date
-
1.12 Lifting Equipment
-
1.13 Plant Operators competency certs (CSCS)
-
2. Construction Safety
-
2.1 Scaffold, Access Equip, Ladders
-
2.2 Protection from falling materials
-
2.3 Working at Height
-
2.4 Excavations, Services
-
2.5 Cat & Genny
-
2.6 Manual Handling
-
2.7 Plant & Equipment including cranes
-
2.8 Site vehicles
-
2.9 Traffic Management
-
2.10 Health Hazards
-
2.11 Permits to Work
-
2.12 Other (from H&S Plan/WPP/Method Statement) (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)
-
-
3. General - Sites / Offices
-
3.1 Welfare-Toilets/washing/drying facilities
-
3.2 Emergency arrangements (displayed)
-
3.3 Fire (extinguishers, arrangements tested, displayed)
-
3.4 Housekeeping/ Tidiness
-
3.5 Lighting/Heating/ Working Environment
-
3.6 Access & Boundaries
-
3.7 Security, Construction Safety Signage
-
3.8 First Aiders Identified and First Aid Equipment in Place
-
3.9 Storage of fuel/detonators/Flammables
-
3.10 General storage
-
3.11 Work activities as per WPP/TBS/MS (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)
-
4. Contractors Staff
-
4.1 Awareness Safety/WPP/TBS/ Method Statement Brief (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)
-
4.2 Hazard Awareness
-
4.3 Compliance with Risk Assessment
-
4.4 Correct Manual Handling Activities
-
4.5 I.D / Access Permits
-
4.6 Wearing of and condition of PPE
-
4.7 Management of sub-contractors
-
5. Railway & Public Safety
-
5.1 No issues to Public Safety
-
5.2 Infrastructure fully protected
-
5.3 Access gates and arrangements for Walking to Site
-
5.4 Other (from H&S Plan/WPP/Method Statement) (Note: for OP ASPRO works in sections 1.4, 2.12, 3.11, 4.1, 5.4, refer also to contractor method statements)
-
6. Track Access including Isolations
-
6.1 Safe Work Pack issued Correct and fit for purpose and signed by all parties
-
6.2 Correct type and no of Safety Critical Staff in place and all Certification correct and in date
-
6.4 COSS Briefing undertaken / understood
-
6.5 Communication Arrangements suitable and tested
-
6.6 WON Details and Track Diagrams supplied and correct
-
6.7 Possession Pack issued and correct if required
-
6.8 AC or DC Arrangements in place limits briefed and RoLE in place as required
-
6.9 Test before touch Carried out
-
6.10 Fenced Protection (Fencing adequate and suitable for location and Line Speed
-
6.11 Separated Protection distance from Nearest Running Line suitable and Site Wardens appointed as Required
-
7. Environment
-
7.1 Environmental Plan & Policy displayed
-
7.2 Waste management arrangements incLicensing
-
7.3 Noise and vibration (assessments, Section 61 notices)
-
7.4 Fumes, Dust
-
7.5 Water Pollution
-
7.6 Pests (Wasps, Rats, etc.)
-
7.7 Graffiti/Vandalism
-
7.8 Litter /fly tipping
-
7.9 Spillages/Spill Kits on site
-
7.10 Vegetation Issues
-
7.11 Awareness of Protected Species and SSSIs
-
End of Shift Text Message sent
-
Time and date end of shift / clear of site
Additional Site Photos
-
Site Photos