Title Page
-
Site Name
-
Conducted on
-
Prepared by
Integration checklist
-
External Alarms configured and tested
-
EC bus and external nodes configured
-
Printscreen of no Alarms on all technologies. (AFTER INTEGRATION IS FINISHED)
-
3G Final CV saved and set as STARTABLE and added to ROLLBACK LIST
-
2G final idb saved
-
Final Cabinet and Site scripts exported
-
All technologies integrated successfully. If not mention why
-
SRS done for all technologies. If not, mention why
Audit checklist
-
Fiber optic cables labeled
-
EC bus cables labeled(From both sides)
-
RRUs power cables labeled (SPD and PDU/Breaker side)
-
DUs power cable labeled (From both side)
-
TRM cables labeled
-
E1 cable labeled
-
3G IP is printed
-
All equipment connected to earth
-
Labeled equipment pictures
-
Remark
-
Installation remark
-
Installation remark pictures