Information
-
Lubbock/Plainview QC Form
-
Conducted on:
-
Location:
-
Prepared by
-
Was this a repeat or multi repeat issue?
Tech Info
-
BBT Name:
-
When was this tech last out?
-
What was this tech out for?
-
Client / Site
-
BBT Name:
-
When was this tech out on the work order?
-
BBT Level
-
Type of job the QC is over.
-
Type of job the QC is over.
-
Are you ready to start the audit?
-
Is this QC for a BBT1/2/3 or 4/5
-
Is the BBT 4/5 QC over which of the following (multiple selections can be made)?
- Power Supplies
- SRO/Work Start/Projects
- Fiber
Power Supplies
-
Power Supply blown out?
-
Power Supply events cleared?
-
Power Supply clean of debris?
-
Powr Supply switched to stand-by correctly?
-
Inverters test good and in all power supplies?
-
Database updated with correct info and if any dicrepancies added in the comments?
Power Supply Exterior
-
Area around power supply cleaned up ( ex. weeds, trash )
-
Power Supply locked and secured?
-
If damaged, comments stating repairs?
-
If graffiti is found, was it cleaned or comments about repairs made?
-
Peds next to power supplies locked and secured?
-
Breaker box locked and secured?
SRO/Work Start/Project
-
Peds locked and secured?
-
Area around ped cleaned and repaired or turned in?
-
Levels are passing the Maint EOL home cert @ tap for work starts?
-
Dust caps secured and not missing?
-
temps turned over for replaceent or documented for repair with ETA?
-
All tap ports terminated?
-
Tap organized in asethetically pleasing manner?
-
Lashing wire secured?
-
CLI leaks fixed or marked by yellow tag?
-
Safety gear warn when work is in progress?
-
Cones properly used when out of vehicle?
-
Actives secured and locked up?
-
all drops secured and tightened?
-
Broken peds fixed or turned over for replacement and documented with ETA and follow up?
-
No loose fittings or housings?
-
All screws secured on passive and active devices?
Fiber Repair or Install
-
Enclosure sealed and secured to ped or strand?
-
Fiber is grounded and secured in trays?
-
Storage is secured and lashed up temporarily taped up every few feet with a documented ETA for permanent repair?
-
All debris is picked up and area cleaned up?
-
Enclosure is marked or turned over to be marked?
-
Data has been sent to AFO for update (id, mileage, GPS Coordinates)?
-
RFOG and GPON fiber splicing secured and set up correctly?
Tap QC
-
Is the alley work overhead, underground or both?
-
Proper pole attachment used, (span clamp on strand or j-hook in pole; no p-hooks in pole)
-
Span clamp attachment is not on the lashing wire
-
Drop hangers used at span clamp and P-hook
-
30" pole framing clearance (drop attachment on correct side of pole)
-
Less than 2 traps connected to any tap port (additional traps secured to strand w/ cableties)
-
Has cable been secured-cable tied under the strand/coax (not on expansion loop)
-
Have all connectors been properly weather protected (sealing sleaves)
-
Have connectors been properly compressed and tightened
-
Are all un-used tap ports sealed and terminated
-
All other connections on pole dressed and proper connectors installed and sealed
-
Is the drop tagged with address tag and service tag (if service tags are used)
-
Was the correct service trap installed
-
Are all clearances correct (note specific discrepancies ex. Pole, street, driveway clearance
-
Less than 2 traps connected to any tap port (additional traps secured to strand w/ cableties)
-
Have all connectors been properly weather protected (sealing sleaves)
-
Have connectors been properly compressed and tightened
-
Are all un-used tap ports sealed and terminated
-
All other connections on pole dressed and proper connectors installed and sealed
-
If underground, is the drop routed underground into the pedestal
-
If underground, is the pedestal secured with a lock or tablock
-
If drop is laying on the ground, was the drop bury turned into the office.
-
Split back riser installed at the pole as needed (UG only)
-
Is the drop tagged with address tag and service tag (if service tags are used)
-
Was the correct service trap installed
-
Are all clearances correct (note specific discrepancies ex. Pole, street, driveway clearance
-
30" pole framing clearance (drop attachment on correct side of pole)
-
Proper pole attachment used, (span clamp on strand or j-hook in pole; no p-hooks in pole)
-
Span clamp attachment is not on the lashing wire
-
Drop hangers used at span clamp and P-hook
-
less than 2 traps connected to any tap port (additional traps secured to strand w/ cableties)
-
Has cable been secured-cable tied under the strand/coax (not on expansion loop)
-
Has cable been secured-cable tied under the strand/coax (not on expansion loop)
-
Have all connectors been properly weather protected (sealing sleaves)
-
Have connectors been properly compressed and tightened
-
Are all un-used tap ports sealed and terminated
-
All other connections on pole dressed and proper connectors installed and sealed
-
If underground, is the drop routed underground into the pedestal
-
If underground, is the pedestal secured with a lock or tablock
-
If drop is laying on the ground, was the drop bury turned into the office.
-
Split back riser installed at the pole as needed (UG only)
-
Is the drop tagged with address tag and service tag (if service tags are used)
-
Was the correct service trap installed
-
Are all clearances correct (note specific discrepancies ex. Pole, street, driveway clearance
Exterior QC Section
-
Are you able to view the extrior of the house (extrior wiring, grounding, attachment points)?
-
Proper drop attachment to the structure (>12" from power, secure, etc)?
-
6" drip loop at attachment?
-
Bonding practices prioritized and following specification?
-
Was grounding tag used?
-
Ground block secured horizontally (service calls only)?
-
Splitters secured with a house (SDU) box (Installs/SRO outet work only)?
-
Have all outdoor connectors been properly weather protected (sealing sleaves & approved connectors)?
-
Have all connectors been properly compressed?
-
Have all connectors been tightened properly?
-
Have all bends in cable followed proper bend radius specs (10 x Diameter of coax used)?
-
All existing outlets properly fastened to house and entrys sealed?
-
Was the cable routed in an aesthetically pleasing manner?
-
Cable clips installed appropriately & neatly spaced 14-18" apart?
-
Was an entry bushing and RTV sealant used at cable/phone line house entry?
-
Drip loop at structure entry w/ appropriate bend radius for cable used?
-
Is the house have an underground drop going to the house?
-
Has conduit been placed at 18-24 inches up the wall into the house box (UG only)?
-
Does the customer have our phone service?
-
Are phone lines properly secured to house (if applicable)?
-
House box or NID mounted securely to house next to power meter (all new installations)?
Interior QC Section
-
Were you able to get inside house to check Interior QC?
-
Was wall plate used at cable entry?
-
Does the customer have our phone service?
-
Was proper phone line connections used to feed the house network?
-
Were all telephone lines tested ?
-
Does telephone line test check OK?
-
Was a dedicated outlet run for modem installations?
-
Were Transmit/Receive levels verified and logged for modem ?
-
Was customer education preformed (ie all functions, services, & features.)?
-
Does the customer have our Data service?
-
Was a dedicated outlet run for modem installations?
-
Were Transmit/Receive levels verified and logged for modem ?
-
Does the customer have our Video service?
-
Were all channels received, verified w/channel line-up?
-
Was customer education preformed (ie all functions, services, & features.)?
-
Was a noise scan done at address?
-
Was general rubbish generated from work removed from customer premise?
-
Comments:
-
Report Card Score: 100 = 5; 99-90 = 4; 89-80 = 3; 79-70 = 2; 69 or less = 1
-
Total Score (100 points possible; 70 or less points is failing):
-
Supervisor Signature: