Information

  • Lubbock/Plainview QC Form

  • Conducted on:

  • Location:
  • Prepared by

  • Was this a repeat or multi repeat issue?

  • Tech Info
  • BBT Name:

  • When was this tech last out?

  • What was this tech out for?

  • Client / Site

  • BBT Name:

  • When was this tech out on the work order?

  • BBT Level

  • Type of job the QC is over.

  • Type of job the QC is over.

  • Are you ready to start the audit?

  • Is this QC for a BBT1/2/3 or 4/5

  • Is the BBT 4/5 QC over which of the following (multiple selections can be made)?

Power Supplies

  • Power Supply blown out?

  • Power Supply events cleared?

  • Power Supply clean of debris?

  • Powr Supply switched to stand-by correctly?

  • Inverters test good and in all power supplies?

  • Database updated with correct info and if any dicrepancies added in the comments?

Power Supply Exterior

  • Area around power supply cleaned up ( ex. weeds, trash )

  • Power Supply locked and secured?

  • If damaged, comments stating repairs?

  • If graffiti is found, was it cleaned or comments about repairs made?

  • Peds next to power supplies locked and secured?

  • Breaker box locked and secured?

SRO/Work Start/Project

  • Peds locked and secured?

  • Area around ped cleaned and repaired or turned in?

  • Levels are passing the Maint EOL home cert @ tap for work starts?

  • Dust caps secured and not missing?

  • temps turned over for replaceent or documented for repair with ETA?

  • All tap ports terminated?

  • Tap organized in asethetically pleasing manner?

  • Lashing wire secured?

  • CLI leaks fixed or marked by yellow tag?

  • Safety gear warn when work is in progress?

  • Cones properly used when out of vehicle?

  • Actives secured and locked up?

  • all drops secured and tightened?

  • Broken peds fixed or turned over for replacement and documented with ETA and follow up?

  • No loose fittings or housings?

  • All screws secured on passive and active devices?

Fiber Repair or Install

  • Enclosure sealed and secured to ped or strand?

  • Fiber is grounded and secured in trays?

  • Storage is secured and lashed up temporarily taped up every few feet with a documented ETA for permanent repair?

  • All debris is picked up and area cleaned up?

  • Enclosure is marked or turned over to be marked?

  • Data has been sent to AFO for update (id, mileage, GPS Coordinates)?

  • RFOG and GPON fiber splicing secured and set up correctly?

Tap QC

  • Is the alley work overhead, underground or both?

  • Proper pole attachment used, (span clamp on strand or j-hook in pole; no p-hooks in pole)

  • Span clamp attachment is not on the lashing wire

  • Drop hangers used at span clamp and P-hook

  • 30" pole framing clearance (drop attachment on correct side of pole)

  • Less than 2 traps connected to any tap port (additional traps secured to strand w/ cableties)

  • Has cable been secured-cable tied under the strand/coax (not on expansion loop)

  • Have all connectors been properly weather protected (sealing sleaves)

  • Have connectors been properly compressed and tightened

  • Are all un-used tap ports sealed and terminated

  • All other connections on pole dressed and proper connectors installed and sealed

  • Is the drop tagged with address tag and service tag (if service tags are used)

  • Was the correct service trap installed

  • Are all clearances correct (note specific discrepancies ex. Pole, street, driveway clearance

  • Less than 2 traps connected to any tap port (additional traps secured to strand w/ cableties)

  • Have all connectors been properly weather protected (sealing sleaves)

  • Have connectors been properly compressed and tightened

  • Are all un-used tap ports sealed and terminated

  • All other connections on pole dressed and proper connectors installed and sealed

  • If underground, is the drop routed underground into the pedestal

  • If underground, is the pedestal secured with a lock or tablock

  • If drop is laying on the ground, was the drop bury turned into the office.

  • Split back riser installed at the pole as needed (UG only)

  • Is the drop tagged with address tag and service tag (if service tags are used)

  • Was the correct service trap installed

  • Are all clearances correct (note specific discrepancies ex. Pole, street, driveway clearance

  • 30" pole framing clearance (drop attachment on correct side of pole)

  • Proper pole attachment used, (span clamp on strand or j-hook in pole; no p-hooks in pole)

  • Span clamp attachment is not on the lashing wire

  • Drop hangers used at span clamp and P-hook

  • less than 2 traps connected to any tap port (additional traps secured to strand w/ cableties)

  • Has cable been secured-cable tied under the strand/coax (not on expansion loop)

  • Has cable been secured-cable tied under the strand/coax (not on expansion loop)

  • Have all connectors been properly weather protected (sealing sleaves)

  • Have connectors been properly compressed and tightened

  • Are all un-used tap ports sealed and terminated

  • All other connections on pole dressed and proper connectors installed and sealed

  • If underground, is the drop routed underground into the pedestal

  • If underground, is the pedestal secured with a lock or tablock

  • If drop is laying on the ground, was the drop bury turned into the office.

  • Split back riser installed at the pole as needed (UG only)

  • Is the drop tagged with address tag and service tag (if service tags are used)

  • Was the correct service trap installed

  • Are all clearances correct (note specific discrepancies ex. Pole, street, driveway clearance

Exterior QC Section

  • Are you able to view the extrior of the house (extrior wiring, grounding, attachment points)?

  • Proper drop attachment to the structure (>12" from power, secure, etc)?

  • 6" drip loop at attachment?

  • Bonding practices prioritized and following specification?

  • Was grounding tag used?

  • Ground block secured horizontally (service calls only)?

  • Splitters secured with a house (SDU) box (Installs/SRO outet work only)?

  • Have all outdoor connectors been properly weather protected (sealing sleaves & approved connectors)?

  • Have all connectors been properly compressed?

  • Have all connectors been tightened properly?

  • Have all bends in cable followed proper bend radius specs (10 x Diameter of coax used)?

  • All existing outlets properly fastened to house and entrys sealed?

  • Was the cable routed in an aesthetically pleasing manner?

  • Cable clips installed appropriately & neatly spaced 14-18" apart?

  • Was an entry bushing and RTV sealant used at cable/phone line house entry?

  • Drip loop at structure entry w/ appropriate bend radius for cable used?

  • Is the house have an underground drop going to the house?

  • Has conduit been placed at 18-24 inches up the wall into the house box (UG only)?

  • Does the customer have our phone service?

  • Are phone lines properly secured to house (if applicable)?

  • House box or NID mounted securely to house next to power meter (all new installations)?

Interior QC Section

  • Were you able to get inside house to check Interior QC?

  • Was wall plate used at cable entry?

  • Does the customer have our phone service?

  • Was proper phone line connections used to feed the house network?

  • Were all telephone lines tested ?

  • Does telephone line test check OK?

  • Was a dedicated outlet run for modem installations?

  • Were Transmit/Receive levels verified and logged for modem ?

  • Was customer education preformed (ie all functions, services, & features.)?

  • Does the customer have our Data service?

  • Was a dedicated outlet run for modem installations?

  • Were Transmit/Receive levels verified and logged for modem ?

  • Does the customer have our Video service?

  • Were all channels received, verified w/channel line-up?

  • Was customer education preformed (ie all functions, services, & features.)?

  • Was a noise scan done at address?

  • Was general rubbish generated from work removed from customer premise?

  • Comments:

  • Report Card Score: 100 = 5; 99-90 = 4; 89-80 = 3; 79-70 = 2; 69 or less = 1

  • Total Score (100 points possible; 70 or less points is failing):

  • Supervisor Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.