Title Page
-
Store Manager
-
Store Name
-
Conducted on
-
Prepared by
-
DD / RD / ROM
-
Stay Safe Representative
-
Availability information
-
Scope of Project
External
-
Car park clear of litter?
-
Landscaping Completed?<br>
-
Car park lining completed to plan?
-
Burger van in correct location?
-
Car park trading set up correctly?
-
Has site clear up been completed?
-
Have new trollies been delivered?
-
Are banner frames in correct position?
-
Are all exterior banners in the correct location?
-
Are all trolley parks in the correct position?
-
Is the fire assembly point identified
Colleague Areas
-
Are colleagues toilets clean and tidy?
-
Is the canteen clean and tidy?
-
Has the canteen refresh been completed?
-
Are all notice boards installed in correct location?
-
Is the Stay Safe board implemented?
Stay Safe
-
Does the store have a current Fire Risk Assessment and then confirm with the STM that FCS will book and conduct a follow up in the next 4-weeks. Any commentary on Fire Safety should be noted.
-
Has the store got a full set of Risk Assessments reviewed in past 12-months and have they planned to review the store Risk Assessments within the next 4-weeks post refit? When the RA's are reviewed each should be noted that a review took place following the refit and then any changes updated on the form as needed. These should be sent to the Stay Safe Business Partner for review once complete.
-
Have all the colleagues conducted mandatory stay safe training within the last 12 months? (Manual handling, risk assessments, fire awareness and workplace transport)
-
Are products which are stored at height done so safely as per the product storage guide?
-
Are there any other safety concerns or advisory points to consider within the snagging or for the STM to take forward?
OPC
-
Are all areas merchandised to the store plan?
-
Is the OPC clean and tidy?
-
Is all high level POS in place?
-
Are the lights set to the correct time?
-
Are there any availability issues?
-
Review all H&S Equipment (Padlocks for fencing & Roofing Felt, Defender Poles, Retainers, Locking Plates etc)?
Warehouse & Yard
-
It warehouse tidy and organised?
-
Is yard accurate with yard plan?
-
Is the yard swept and is it tidy?
-
Is there any excess equipment that needs removing?
-
C&C areas clear, Racking set up to current brief and trolleys in place?
-
Is the high value room secure, Tidy and Safe?
-
Are all void / storage areas clean and tidy?
Shopfloor
-
Are all areas merchandised to plan?
-
Is the current promotional campaign implemented in full?
-
Are any current Spikey, TLP etc in place?
-
Are there any availability issues?
-
Are all single tiles coded?
-
Is the tagging brief completed?
-
Are all displays in place (marshalltown, Bosch, Scruffs, Stanley, Showers, taps etc)?
-
Is trade concept implemented in relevant areas?
-
Is all H&S Signage in place?
-
Review all H&S Equipment (Padlocks for fencing & Roofing Felt, Defender Poles, Retainers, Locking Plates etc)?
-
Are all colleagues wearing the correct uniform?
-
Does all it equipment work?
-
Is the phone system working?
-
Is all headsets in use and working?
-
Do HHT's work?
K&B Showroom
-
Is all showroom POS in place
-
Is the coffee machine in place and working?
-
Has all display dressing been completed?
-
Is the showroom clean and tidy?
Final Comments & Sign off
-
Add signature