Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Job Adress

  • job number

Supervisor Pre Start

  • Job Number

  • Photo of front of job

  • Builder

  • delivery date

  • inspection date

  • cover date

  • fall prtection date

  • Has appropriate propping been installed

  • Are creeper rafters installed?

  • is there enough room for delivery

  • is temporary fencing installed and upright

  • is stair void covered

  • Have fascia and gutters been installed

  • Are the valley irons installed

  • Are the box gutters installed

  • Are all flashings installed

  • is the power on

  • Generator required

  • Is there a long carry and has payment been approved

  • Has the builder or site supervisor been notified of any trip hazards

  • Has guard rail been installed and are gates accesible

  • Is there a bin onsite

  • Have all hazards been controlled

  • comments

undefined

Pre Start Contractor

  • Contractors Name

  • Date of work

  • Have all employees been inducted to SWMS

  • Is fall protection installed correctly and all rails secured in place

  • Are appropriate props used to support any areas permanent roof support structure is complete

  • Are all ladders properly set up with clear area at base of ladder

  • Is the tile elevator properly secured without impacting fall protection

  • Have you insured no other trades are working onsite

  • Are all tools tagged

  • Are stairwell voids and floor and penetrations covered

  • Has uv/ sun exposure been controlled

  • Have you insured there are other hazards not specifically mentioned in above checklist

  • How many pallets of Tiles and rows of Ridge have been delivered

  • Does the colour and profile match the colour

  • Please comment and provide photos of any missing fascia/ gutter or any other problems that may prevent completion of this roof

  • Power on

Tiler completion advice

  • Has the roof been installed to Australian standards

  • Pointing finished and colour acceptable

  • Weep holes installed where required

  • Site left clean

  • Hips and top ridge straight

  • Valley cuts straight and mechanically fixed

  • Are tiles mechanicallysecured along dry gables

  • Are the battens set out correctly

  • 150mm sarking overlap and 25mm into gutter

  • Have all temporary gates been closed

  • Have all broken tiles be replaced

  • Are all flashings and box gutters installed

  • if fall protection has been adjusted in order to complete the job , has it been reinstated as first found

  • All waste , including batten scrap been placed into the bin

  • Is roof water tight

  • Is there a tile or ridge shortage

  • Are there 12 spare tiles placed in the garage

  • Is this job completed? If not please provide photos and comment as to why it was not able to be

  • PLEASE PROVIDE PHOTOS FROM ALL SIDES OF THE ROOF

Maintenance Audit

  • Date of roof service

  • Maintenance tiler

  • Replaced all broken tiles

  • How many tiles replaced

  • Left site clean

  • Are gutters clean

  • Is roof water tight

  • Has the evaporative cooler been installed

  • Has the heater pipe been installed

  • Has the solar hot water been installed

  • Has the whirly bird been installed

  • Is there a skylight installed

  • Has all the plumbing works or after trade wprks been completed ( if not please provide photos )

  • How many penetrations

  • PHOTO OF STICKER IN METER BOX

  • Photo of 12 spare tiles

  • Is maintenance FULLY COMPLETED

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.