Title Page
-
Conducted on
-
Prepared by
-
Location
Job Address:
Name of Carpenter:
Photo of the front of the site;
-
Add media
-
Has carpenter flicked out chalk lines for set out?
-
Is the frame NOT hanging over the slab more than 10mm?
-
Are all walls plumb & square in accordance with plans?
-
Are all walls installed as per plans / per room?
-
Has all structural steel as been installed per engineer plans?
-
Has the steel garage door plates been installed to garage door beam, is the garage beam height as per plan?
-
Has Stair void trim been installed as per floor and joist layout?
-
Have floor joists, joist hangers been installed as per floor joist plan?
-
Flooring to be screwed as per manufacturers specifications? -4 screws across & 6 screws on either end -glued using floor adhesive -tongue & groove
-
Have bottom plates on first floor been screwed to floor on all internal walls and external?
-
Are roof trusses 600mm centres, set plumb with bottom chords straight, as per Frame and Truss manufactures layout?
-
Are Trusses braced in accordance with Roof bracing layout?
-
Are two 70 x 35mm boards installed on each side of valley to support valley iron?
-
Are bottom chord ties 70 x 35 nailed and over crossed over 2 bottom chords at joins
-
Are all girder bolts installed and tightened to boots?
-
Are additional ceiling trimmers installed at change of direction as per plasterboard specifications (600 centres in all bays)?
-
Are timber battens fixed at 150mm centres at the top of the bottom chord of trusses above stairwell fall protection?
-
Is there adequate storage platform near manhole for spare tiles & paint (i:e 900 x 900 minimum)?
-
Are manholes trimmed as per architectural drawings?
-
Have crush plates, cyclone ties, triple grips, L brackets and jack struts been installed as per roof layout?
-
Have all windows been installed (pre drilled) with margins set correctly for Gyprock and Villaboard, including timber rail under, setting any?
-
Have all kitchen windows been installed to plan heights/removal of bottom jamb/square set?
-
Has all bracing been installed as per the layout?
-
Has blocking been installed in the cavity between drop edge beam and frame?
-
Have all wet area blockings been installed as per the bathroom layout?
-
Has bath cut been completed as per plans and colours plans?
-
Are all openings as per plan? -1 or 2 doors add 50mm -3 or 4 doors add 90mm.
-
Have all bulkheads been installed straight throughout the home?
-
Has the step down frame been packed between slab and frame 3mm below slab level?
-
Have drainage holes been installed to first floor beside (hard up) frames (not in the middle of floor areas)?
-
Are windows and doors positioned as per elevations on drawings?
-
Has the void protection ladder and fall perimeter protection been installed to first floor?
-
Are bifold doors, sliding doors and stacker doors correct handing?
-
Has all rubbish been placed in the bin enclosure provided and the house swept out (install cage if required)?
Items that need to be rectified:
Additional comments to trade:
Additional photos required:
-
Add media