Title Page

  • Conducted on

  • Prepared by

  • Location

Job Address:

Name of Carpenter:

Photo of the front of the site;

  • Add media

  • Has carpenter flicked out chalk lines for set out?

  • Is the frame NOT hanging over the slab more than 10mm?

  • Are all walls plumb & square in accordance with plans?

  • Are all walls installed as per plans / per room?

  • Has all structural steel as been installed per engineer plans?

  • Has the steel garage door plates been installed to garage door beam, is the garage beam height as per plan?

  • Has Stair void trim been installed as per floor and joist layout?

  • Have floor joists, joist hangers been installed as per floor joist plan?

  • Flooring to be screwed as per manufacturers specifications? -4 screws across & 6 screws on either end -glued using floor adhesive -tongue & groove

  • Have bottom plates on first floor been screwed to floor on all internal walls and external?

  • Are roof trusses 600mm centres, set plumb with bottom chords straight, as per Frame and Truss manufactures layout?

  • Are Trusses braced in accordance with Roof bracing layout?

  • Are two 70 x 35mm boards installed on each side of valley to support valley iron?

  • Are bottom chord ties 70 x 35 nailed and over crossed over 2 bottom chords at joins

  • Are all girder bolts installed and tightened to boots?

  • Are additional ceiling trimmers installed at change of direction as per plasterboard specifications (600 centres in all bays)?

  • Are timber battens fixed at 150mm centres at the top of the bottom chord of trusses above stairwell fall protection?

  • Is there adequate storage platform near manhole for spare tiles & paint (i:e 900 x 900 minimum)?

  • Are manholes trimmed as per architectural drawings?

  • Have crush plates, cyclone ties, triple grips, L brackets and jack struts been installed as per roof layout?

  • Have all windows been installed (pre drilled) with margins set correctly for Gyprock and Villaboard, including timber rail under, setting any?

  • Have all kitchen windows been installed to plan heights/removal of bottom jamb/square set?

  • Has all bracing been installed as per the layout?

  • Has blocking been installed in the cavity between drop edge beam and frame?

  • Have all wet area blockings been installed as per the bathroom layout?

  • Has bath cut been completed as per plans and colours plans?

  • Are all openings as per plan? -1 or 2 doors add 50mm -3 or 4 doors add 90mm.

  • Have all bulkheads been installed straight throughout the home?

  • Has the step down frame been packed between slab and frame 3mm below slab level?

  • Have drainage holes been installed to first floor beside (hard up) frames (not in the middle of floor areas)?

  • Are windows and doors positioned as per elevations on drawings?

  • Has the void protection ladder and fall perimeter protection been installed to first floor?

  • Are bifold doors, sliding doors and stacker doors correct handing?

  • Has all rubbish been placed in the bin enclosure provided and the house swept out (install cage if required)?

Items that need to be rectified:

Additional comments to trade:

Additional photos required:

  • Add media

Please note payment cannot be made until items are fully rectified. For additional information on this please speak to the Site Manager.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.