Title Page
-
Site conducted
-
Project Refrence
-
Project Name
-
Training Performed by
-
Conducted on
-
Site arrival time
-
Site leaving time
-
Company
-
Company Representatives
-
Number of Trainees
-
Location
-
Weather Conditions
-
Specify Temperature
Project
Training
-
System Type
- Type A
- Type B
- Type C
- Combined System
- Injection Resins
- Sump & Pump System
-
Observations
-
Substrate
-
New or Old concrete
-
New or Old concrete
-
Condition of substrate
-
Notes
-
Notes
-
Notes
-
Notes
-
Preparations
-
Products
-
100
-
200
-
300
-
400
-
500
-
600
-
700
-
800
-
900
-
Sump & Pump
-
Recomendations/Comments
Photographs
-
Images/Video
Health & Safety
-
Health and Safety Concerns
-
Comments
Disclaimer
-
The information and comments within this site training report apply only to the instruction of the installation of Newton Waterproofing Systems products shown at the time of the visit. This does not include any guarantee of the installation.
-
With signing this document, Newton now acknowledges you have received the appropriate demonstration to utilise the mentioned product(s) according to Newton Waterproofing Datasheets, and best practice will be followed.
-
Newton is not responsible for checking that the appropriate measures are correctly carried out on-site according to our recommendations.
Sign Off
-
Newton Signature
-
Accreditations