  • Conducted on

  • Prepared by

  • Location

Site Requirements and Safe Work Method Starements (SWMS)

  • Have you completed the contractor induction , read and understand the swms

  • If you have any workers have they completed the contractor induction , read and understand the swms

  • Do you have a copy of the relevant swms

  • Are there any other hazards not covered by the swms please report it to the site supervisor

Site Conditions

  • Have you read the projects site specific coordination plan taking note of specific hazards

  • Is there safe access to your work area

  • Take a photo of your work area and access along with if any timber framing has been delivered

  • Have you inspected the site for any hazards that may injure you or your workers

  • Amenities in reasonable condition first aid is readily available and stocked sufficiently all emergency contact details current

  • Stairwells including temporary stairs are in place and secure with a step not greater then 190 mil

  • Void platforms are in place and secure..., if noted installers details attached with install date

Tools and Equipment

  • Are ladders and work platforms commercially rated and in good working order

  • Is all electrical equipment in good working order with there guards and dust bags/vacuum attachments fitted correctly

  • Do you and your workers have the right PPE and safety equipment

Hazardous materials

  • Do you have your MSDS register with you

Pre start Checklist

  • The pre start checklist is to be completed onsite to provide assurance and feedback where required please confirm you and any workers you have are onsite during install and QA

Ground level

  • If concrete , is it square and level

  • According to site plan are the timber panelised elements correct with actual concrete slab dimensions

  • Preinstalled timber/steel beams correctly placed according to plan if not please take a photo and notify site supervisor immediately

  • Has Partiwall been installed as per manufacturers installation

Floor Cassettes/ Safety rail / Void platforms

  • Has all intermediate floor cassettes been installed according to site plans

  • Has all fixings/bolts and required connections been installed for Intermediate floor cassettes

  • Is all Intermediate floor cassettes square/level

  • Has safety rail been installed

  • Has void platforms been installed

Install QA

  • Works undertaken as to date of QCA Has all timber frames panelised walls/floors/roof elements been installed according to site plan

  • Are walls/floors/roof elements square/level/plumb

  • All timber elements installed free of defects if not please take a photo and notify Next Form site supervisor noting which unit and room it correlates too

  • Has all props/braces been securely fixed in place for temporary support

  • Any uninstalled timber elements been temporarily secured to avoid damage to yourself or workers or anything onsite

  • All rubbish removed from work area

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.