Daily Rig Inspection

  • Rig Number

  • Job Number & Location

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Drill Rig

  • Inspection Date/Time

  • Drill Rig Number

  • Driller

  • Hour meter

physical

  • Any Visible hazards?

  • Engine in good working condition

  • Any visible Fluid Leaks

  • Water Level

  • Oil Level

  • Hydraulic Oil level

  • Foreign Objects in Tracks

  • Rig Properly Greased before use

Mast

  • Bolts Tight

  • Any Visible Cracks

  • is the mast bent?

Cables

  • Broken wires

  • any bends or kinks

  • Missing,Frayed or high strands

  • Cable Clamps tight and not missing

Pulleys

  • Pulleys not Bent ,Broken, cracked, Excessive wear

  • Sheave Wheels Spin Freely?

Lifting Clasps and Rings

  • Hooks properly installed?

  • Hooks showing signs of wear?

  • Hooks Locking Properly

  • Lifting Rings in proper working order

  • Lifting Rings have excessive wear?

Leveling Jacks

  • any cracks

  • any leaks

  • lifting properly

Hammer

  • Mounted Properly?

  • Free of cracks

  • All Hardware in place and tight

  • Chain adjusted properly

  • Cathead have any rust or grooves?

Tracks

  • Free of mud and debris?

  • Properly Tensioned?

  • Excessive Wear?

Hoses

  • free of leaks

  • no excessive wear or slices

Controls

  • free of debris

  • move freely

  • properly labeled

  • gauges visable intact and working

Signatures

  • Employee

  • date and time

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.