Title Page
-
Site
-
Conducted on
-
Prepared by
-
Site Type
-
Are you able to complete a Full Audit or Half Audit?
-
Techs and/or Subcontractor who worked on Site
Quality Assurance
-
FTP Installation
-
Add media
-
FTP / BUDI / FAT Cable Management
-
Add media
-
Fibre / Hybrid / Conduit Run or installation
-
Add media
-
ONT Installation
-
Add media
-
ONT Cable Management
-
Add media
-
Has the ITP been installed to Chorus Standard?
-
Add media
-
Has the Hybrid / Composite Cable been connected to legacy wiring (Integration) correctly
-
Add media
-
Aerial Lead at Premise
-
Add media
-
Aerial Lead at Pole
-
Add media
-
Aerial Lead at Multiple Spans
-
Add media
-
Concrete slot-cut (micro-cutting)
-
Add media
-
Please add requirements to rectify the Fault
-
Add media
-
Surface mounting
-
Add media
-
Trenching
-
Add media
-
Draw tapes replaced?
-
Add media
-
Reinstatement ISB and OSB (Soft Surface ONLY)
-
Add media
-
Please add requirements to rectify the fault
-
Add Photos and highlight issues above
-
Reinstatement ISB (Hard Surface Only)
-
Add media
-
Please add requirements to rectify the Fault
-
Add Photos and highlight issues above
-
Reinstatement OSB (Hard Surface Only) - Please make sure that this is compliant with Council requirements
-
Add media
-
Please add requirements to rectify the fault
-
Add Photos and highlight issues above
-
Is the end-customer happy how the task was planned & completed?
-
Please leave customer a COCL Card with the SO# (Service Order Number) and request them to visit Chorus website and leave feedback
-
Please add customer/s concerns
-
Site cleanliness:
-
Please give feedback regarding what needs to be improved
-
Please attach photos where improvement is required
-
Please add requirements to rectify the fault
-
Add Photos and Highlight issues above
-
Inspected by:
-
Audit Rating (out of 20)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
-
Pass or Fail
-
Notes