Information
-
Viscore ID:
-
Address
-
Fibre Access Type
- OHUG
- Infill
- 3rd ONT
- Move of Network
- Bitstream 4
- Rural Fibre
- Misc
- N4L
-
Site Survey Conducted by:
Fibre Access for UFB Connect Criteria
-
Is heavy duty build equipment required?
-
Provide a description of the work for referral to BAU build
-
Can ROW crews complete this fibre access build?
-
Provide a description of the work for referral to BAU build
-
Is there more than 5m OSB hard surface reinstatement is required?
-
Is there more than 10m OSB soft surface reinstatement required?
Scoping Details
-
Describe the fibre access connection from network to customer.
-
Add photos for design. Network connection - OSB; access for customer - ISB
-
Will the connection be serviced via ABF, fixed fibre or aerially?
-
Other requirements? I.e TMP, Arborist
- No
- L2 TMP
- Arborist
-
Additional Notes
Health, Safety and Environmental Issues
-
Have existing utility corridors been considered using on site observations & plans as part of the scope?
-
Build work in close proximity to HV Electricity or HP gas equipment?
-
Working at heights?
-
Dogs on site?
-
Unprotected edge? e.g. Trench, depression or waterway
-
Enter further notes for HS&E risk elimination or mitigation, e.g chemicals or asbestos, confined spaces, gas detection requirements etc.